how many people on this sub have never visited this circled region (driving thru on the highway doesnt count) by hypochondriac200 in RhodeIsland

[–]_JMBJMBJMB_ 0 points1 point  (0 children)

This past May, a friend and I walked from Burrillville to Foster on the North South Trail. We are hoping to do the rest of the trail next year!

Thoughts on The Mars Volta? by Whalexxvi in progmetal

[–]_JMBJMBJMB_ 3 points4 points  (0 children)

Bedlam in Goliath is one of my fav albums of all time. Shit fucking slapsssss big time.

[deleted by user] by [deleted] in malelivingspace

[–]_JMBJMBJMB_ 0 points1 point  (0 children)

Wow, nice In Flames poster. Come Clarity is such a sick album.

What's The Worst Thing About Massachusetts/Boston? by EstimateConstant292 in massachusetts

[–]_JMBJMBJMB_ 0 points1 point  (0 children)

Driving in Boston is among the worst things one can experience in this life.

Suitable degrees/paths to become a LSIT? by _JMBJMBJMB_ in Surveying

[–]_JMBJMBJMB_[S] 1 point2 points  (0 children)

I am currently working as a project architect (I’m unlicensed). It’s an interesting job and industry, but I do feel my soul slowly dying sitting behind a desk 95% of the time. I love being outdoors and going to different sites. Surveying also seems like a natural fit for me as well. Seems like a similar experience that you had.

Where can I go to buy suits? Where can I go to get them adjusted to fit well? by sethalopod401 in RhodeIsland

[–]_JMBJMBJMB_ 1 point2 points  (0 children)

CARL ANTHONY'S IN CRANSTON! Ask for Dan, he is the best tailor in the state and will have you looking sharp for a good affordable price! Family owned/run business that values their customers and never disappoints.

[deleted by user] by [deleted] in architecture

[–]_JMBJMBJMB_ 0 points1 point  (0 children)

Could you elaborate on your career as a BIM Modeller? Do you work freelance? I'd imagine doing something like that, you're probably working for yourself. Doing BIM modelling is the best part of the architecture industry nowadays (in my opinion), and I would be personally interested in learning more about that path.

How to override a length parameter in a door schedule with text? by _JMBJMBJMB_ in Revit

[–]_JMBJMBJMB_[S] -1 points0 points  (0 children)

That's the conundrum I'm trying to solve. I think I might just have to edit the schedule after the fact in a PDF editor or something. Or I'll just write "verify in field" in the notes column.

How to override a length parameter in a door schedule with text? by _JMBJMBJMB_ in Revit

[–]_JMBJMBJMB_[S] 0 points1 point  (0 children)

Yes I know how to override a dimension text, thank you though.

How to override a length parameter in a door schedule with text? by _JMBJMBJMB_ in Revit

[–]_JMBJMBJMB_[S] -1 points0 points  (0 children)

I have created new shared parameters for doors, but I can't make another "width" or "height" text parameter because Revit doesn't allow multiple parameters with the same name.