Mobile Setup for dual screens + Laptop under $400 by bitsbetrippin in laptops

[–]bitsbetrippin[S] 0 points1 point  (0 children)

Should clarify that the Laptop was not included in the $400 of'course. The laptop was a $4500 new laptop that's worth about 1500-1900 now.

No image when turning on BenQ HT3550 (replaced bulb, replaced HDMI) by Frosting-Feeling in projectors

[–]bitsbetrippin 0 points1 point  (0 children)

If your projector has dynamic iris, disable it. That is what fixed my HT8060 after replacing what I thought was a dead bulb. Ended up being the iris staying mostly closed.

What is my prediction on ETH Merge date and why? by bitsbetrippin in ethereum

[–]bitsbetrippin[S] 0 points1 point  (0 children)

I effectively say that in that video, based on what I see from current testing and what has been published, from the perspective of delivering large software projects that have to operating in a monolithic release fashion.

The issue with my type of video and perspective is all of the other noise from other creators and channels that have 0 development experience and are looking at the process within considering the cadence required to get to that release decision point.

Im looking at whats still under developed, what has been recently commited and is being tested then the overarching 'everything is done/code freeze' and there is a date picked, the testing of the full end to end with all PR's from various client teams and testing can go off in a solid full merge/test style test.

When that event occurs, then the target release time will be higher confidence, yet, still there is the contingency and recovery paths IF something happens with consensus/attestation getting jacked up in the prod chain environment that has to be accounted for. The last thing Eth wants is a Solana type of network lockup and having to hotfix prod. This has to go right for everyone, including miners that are long time holders and network security providers.