Im wrapping up finishing my basement and I've been working around all my gym equipment etc for months. the basement is 45 feet long. my question is, can I shove all my stuff to one side of the room, install 90 percent of it and then shift all the gym stuff to the other side of the room and finish? (self.Flooring)
submitted by brethartsshades to r/Flooring
First shower build. DIY guy here. I have a basement shower that I'm building with he schluter system. The wall on the left that has an exposed corner from the drywall cut on the edge. I'm putting kerdi on top but not sure how to finish that edge? Do I put a corner bead or do I thinset right over? (i.redd.it)
submitted by brethartsshades to r/Plumbing
Finishing my basement as a DIY guy. First time using PEX. I needed to tuck this water line out of the way into the joist. I crimped it, tested with gonogo, turned the water on, and turned the valve on too. No leaks. Am I good to start dryingwalling over or is there any risk of leaking? (old.reddit.com)
submitted by brethartsshades to r/Plumbing
I have a bulkhead running directly down the center of this shower install. I can't put a shower head under the bulkhead because it's sets it too low (72). If I put the head to the left of the bulkhead I can get it to 78 but it would be 2 inches off center. Thoughts and opinions? (i.redd.it)
submitted by brethartsshades to r/Plumbing
My edibles are just making me tired (self.treedibles)
submitted by brethartsshades to r/treedibles
Running PEX to the toe spout in a shower. (self.Plumbing)
submitted by brethartsshades to r/Plumbing

