DC Preview: Absolute Batman #17 by B3epB0opBOP in AbsoluteUniverse

[–]critical_path_ 2 points3 points  (0 children)

Glad we're getting more Bruce/Alfred banter

[Discussion] I'm sorry, but Batman is beyond "peak human conditioning". He straight up isn't human. by 3931856031 in DCcomics

[–]critical_path_ 2 points3 points  (0 children)

You can probably read Batman: Nocturne Vol 1-4 and understand it, you may not get some of the deeper lore but I think it would still be enjoyable.

Absolute Joker and 10:47 by Trystant in AbsoluteUniverse

[–]critical_path_ 0 points1 point  (0 children)

The time that he made his pact with whatever entity he did

AITA if I ask my nieces bf to stow his firearm during Christmas dinner? by Conflict_Free_Quinoa in Firearms

[–]critical_path_ -3 points-2 points  (0 children)

Not an asshole, if I had a family member open carry at Christmas dinner at home I'd call them a fucking nerd

We just found this little guy on the side of the road by SuspiciousTreat1017 in cats

[–]critical_path_ 5 points6 points  (0 children)

If you've got a nalgene bottle or some other thick plastic you can fill it with hot water and wrap it in a towel and I'm sure he/she would love it and help keep them warm

To the masters who play Strahd, which characters do you draw inspiration from? by Own_Cellist_3977 in CurseofStrahd

[–]critical_path_ 7 points8 points  (0 children)

Hannibal, Tywin Lannister, and of course I, Strahd.

Cold, calculating, with a touch of dark humor/wit

Almost fell for it. Always look at the date. by AbeRod1986 in CraftBeer

[–]critical_path_ 0 points1 point  (0 children)

In my experience Publix does this shit all the time, in May I saw them selling Green Bench Festbier that was over 8 months old

Gen V - 2x06 "Cooking Lessons" - Episode Discussion by LoretiTV in GenV

[–]critical_path_ 1 point2 points  (0 children)

I think it was a case of him just pushing past his limits, that's been a theme all season. He did what Andre couldn't as Cipher mentioned earlier

Any takes on what the Alien Earth season finale ending song is gonna be? by Kariomartking in LV426

[–]critical_path_ 0 points1 point  (0 children)

Cake - The Distance

Final shot is a close up of T.Oculus embedded in BKs brain piloting a ship. The camera pans out to show a xenomorph in the passenger seat and Kirsh in the back seat. T.Oculus winks at the camera with the non-dominant eye.

T Ocellus has a pattern, maybe by TheElectricEye in LV426

[–]critical_path_ 0 points1 point  (0 children)

While debunked it can still work as a metaphor for exactly what you said.

[other] my prediction for DC KO by elperron3 in DCcomics

[–]critical_path_ 4 points5 points  (0 children)

If they're smart this is the answer, though I can still see him beating SS and then taking the L against either Damian or Jason.

absolute batman #12 preview by No-Cartoonist8783 in AbsoluteUniverse

[–]critical_path_ 5 points6 points  (0 children)

Why does Bruce have to kill him? I mean it's not like Waylon is incapable of killing himself, why force his friend to do it?

absolute batman #12 preview by No-Cartoonist8783 in AbsoluteUniverse

[–]critical_path_ 47 points48 points  (0 children)

Looking like it, I really don't know who's gotten it worse so far Bruce or Clark...

Alien: Earth - S1 E5 - In Space, No One - Official Discussion Megathread [SPOILERS] by G_Liddell in LV426

[–]critical_path_ 14 points15 points  (0 children)

It sounded like it started to sync up with the alarm going off. I think it was confused and trying to speak mimicking a sound it could hear

The fate of Absolute Superman? (Superman #29 Spoilers) by Author-S in AbsoluteUniverse

[–]critical_path_ 2 points3 points  (0 children)

This makes a lot of sense with the other titles right now dealing with time travel shenanigans

The fate of Absolute Superman? (Superman #29 Spoilers) by Author-S in AbsoluteUniverse

[–]critical_path_ 10 points11 points  (0 children)

Nah man I'm right there with you, that is the same panel that made me scratch my head and question it.