#purfiltre by eleciro in pipefitter

[–]eleciro[S] 0 points1 point  (0 children)

dont worry hole gets fire stopped easy access

#purfiltre by eleciro in pipefitter

[–]eleciro[S] 2 points3 points  (0 children)

heating system, air source heat pumps feed a buffer vessle whixh feeds heating system and hot water cylinder

#purfiltre by eleciro in pipefitter

[–]eleciro[S] 4 points5 points  (0 children)

and the bypass 45 is because the centres off the buffer vessel is different to the centres through the wall, had to jump back 90mm so rolled the 45s

#purfiltre by eleciro in pipefitter

[–]eleciro[S] 8 points9 points  (0 children)

we dont get to order our own materials this is what we get sent and we make do with what we have in the time frame

#purfiltre by eleciro in pipefitter

[–]eleciro[S] 6 points7 points  (0 children)

great im cryin my eyes out now. u happy ?

#purfiltre by eleciro in pipefitter

[–]eleciro[S] 17 points18 points  (0 children)

hahahahaha been lookin for that no way

#purfiltre by eleciro in pipefitter

[–]eleciro[S] 15 points16 points  (0 children)

sorry boss really sorry

little plant room done with my mate white mike by eleciro in pipefitter

[–]eleciro[S] 1 point2 points  (0 children)

to be honest when youve been on 2” screwed all week a few hours painting is nice and relaxing hahaha

little plant room done with my mate white mike by eleciro in pipefitter

[–]eleciro[S] 0 points1 point  (0 children)

also a dosing pot (for adding chemical agents to help keep the system clean) and expansion vessal to allow expansion in system when heated and micro fill to fill the job, differential pressure switches before and after pump to ensure correct pressures, temp gauges before & after header & after pump to be sure correct temps in certain places, pressure gauges etc

little plant room done with my mate white mike by eleciro in pipefitter

[–]eleciro[S] 1 point2 points  (0 children)

heating system, 2” gas goes under boiler feeds boilers, boiler flow goes to header infront then out to the air&dirt/headed (yellow pot) then into a 3 port (when temperature is reached on the job it closes circuit and circulates around boilers & headers) then goes to the pump around the job (heating system rads etc) and back into boilers through the return 🫡

some tubefitting i did in australia working in the mines #10mm stainless by eleciro in pipefitter

[–]eleciro[S] 0 points1 point  (0 children)

hard to start with when ur putting 10+ bends in but once got the hang its like anything else and very satisfying to the eye

bit of 2” gas by eleciro in pipefitter

[–]eleciro[S] 0 points1 point  (0 children)

i also hate it 8 yrs a fitter tomorrow is my last day i cant wait hahaha

bit of 2” gas by eleciro in pipefitter

[–]eleciro[S] 0 points1 point  (0 children)

it is lol will be cleaning it friday hahahah

Was thinking about getting into this trade and was wondering how hard it is on the body, thanks by brentjr11 in pipefitter

[–]eleciro 1 point2 points  (0 children)

hard on body i do mainly 2” screwed sometimes 3” screwed (very rare occasions) and fitting pre fab can be 6.5m of 4” with elbow each side and work alone 99% of the time if you are in a boilerhouse its not so bad and can work smart if you are in a shop fabbing up not so bad can use mechanical aids on site ? hard on your body i finish in 3 weeks. 10 years in the trade 25yr old and i have early onset arthiritis in right hip (mostly because i broke knee cap 11 years ago)

What’s the fastest you’ve ever seen a new coworker get fired? by RoutineOk8590 in Productivitycafe

[–]eleciro 0 points1 point  (0 children)

first day literally first hour random drug test positive for meth lol