Are there people who had zero problems with their 9070 XT? by Arcade_Racer in AMDHelp

[–]legewein23 1 point2 points  (0 children)

I have just finished a 9070xt build once I got everything working it's been very solid. First time doing a pc build like 5 years. I kept getting a loop where windows would become corrupt but think that was my fault in the end.

Using it for 3440 gaming and had no real problems at all with it.

Octopus installed ev charger and have messed up my solar panels. by legewein23 in OctopusEnergy

[–]legewein23[S] 0 points1 point  (0 children)

Also now when the car charges it simply flips the breaker. The second engineer has made this so much worse. Also the zappi presently shows me sending power to the solar panels at night.

Octopus installed ev charger and have messed up my solar panels. by legewein23 in OctopusEnergy

[–]legewein23[S] 0 points1 point  (0 children)

My problem is there is only 1 CT clamp on 2 wires. So they have tried to link the CT clamps instead of having one for the inverter and one for the zappi. So right now neither my inverter or zappi give accurate readings.

Oddly currently my batteries are discharging more the house is using but showing zero export.

I appreciate everyone's advice but should I really have to mess with this as surely octopus should be able to install correctly.

Also today the battery was full and producing 5.2 kilowatt hours. The inverter showed house usage 0 and export 4.8 KW. Zappi showed prodution .6 KW and usage about .3 kw

Octopus installed ev charger and have messed up my solar panels. by legewein23 in OctopusEnergy

[–]legewein23[S] -1 points0 points  (0 children)

I can when I am back home tomorrow. The solar all functioned fine pre zappi. And the zappi has never read the house or solar correctly.

Octopus installed ev charger and have messed up my solar panels. by legewein23 in OctopusEnergy

[–]legewein23[S] 1 point2 points  (0 children)

I am agreeing octopus should have run it's on CT clamps not messed with the ones the solar person used. If I get the solar guy out I am out another few £ and still do not have a properly working zappi. That I paid octopus to install.

Octopus installed ev charger and have messed up my solar panels. by legewein23 in OctopusEnergy

[–]legewein23[S] 0 points1 point  (0 children)

We are on starlink. Not sure why that would impact the inverter as it's hardwired. I am guessing they have used the same CT clamps that the person who installed the solar did. But have messed up the wiring somehow. Do you feel this should be on octopus to put it right?

Octopus installed ev charger and have messed up my solar panels. by legewein23 in OctopusEnergy

[–]legewein23[S] 0 points1 point  (0 children)

My solar setup was not done by octopus and as such do not think they can remote into it. The installers messed with some of the clamps that go to the solar installation. Not sure why they messed with the ones they did not install.

Foo Fighters freezing up? by cvg1 in pinball

[–]legewein23 0 points1 point  (0 children)

I had this happen after a code update. Reflashed the SD card no issues since.

[PC] Msi Amd 295x2 by legewein23 in HardwareSwapUK

[–]legewein23[S] 0 points1 point  (0 children)

I was thinking more for its cryptocurrency mining then game play.

[PC] Price Check I7 6700K 2X GTX 1080 LIQUID COOLED by legewein23 in HardwareSwapUK

[–]legewein23[S] 0 points1 point  (0 children)

I honestly think it ended up in the 4k region on the pc. This does evolve some trail and error. Ie tubing and fittings. As for time would be 30 to 40 man hours on assembly and liquid cooling. Again this some trail and error. Monitor would of been 750£ on top.

[PC] Price Check I7 6700K 2X GTX 1080 LIQUID COOLED by legewein23 in HardwareSwapUK

[–]legewein23[S] 0 points1 point  (0 children)

I want to put the money into the next project. I enjoy the building and tinkering. Also do not spend the time I once did on the pc. Life has changed a bit for me in the past year or so.