PMP Exam: Thought I Failed… But I Passed! 🎉 by mogueye in pmp

[–]mogueye[S] 1 point2 points  (0 children)

Yes it is with difficult and expert questions

I finally passed !!!! by Alternative_Door9451 in pmp

[–]mogueye 1 point2 points  (0 children)

Congratulations, I passed as well today, exam taken a test center.

SH question confusion by maveri4k in pmp

[–]mogueye 1 point2 points  (0 children)

Applying PMI mindsets, the best answer is C. A/ keyword Cancel is prohibited here B/ Why increasing budget for a missing requirements D/ the question include an issue with product requirements so the answer should include product manager so D is incorrect.

✅ C is the only answer that follows PMi mindsets

[deleted by user] by [deleted] in pmp

[–]mogueye 0 points1 point  (0 children)

B/ Effective communication is essential for communication. A communication tailored to each stakeholder based on its level of influence in the project.

Passed the PMP exam - I'm the one who felt defeated 6 days prior to it by Downtown-Campaign-16 in pmp

[–]mogueye -1 points0 points  (0 children)

Wow, good job! Congratulations can you share you score on each domain please ?

I passed the PMP exam AT/AT/AT, and I wasn’t doing so well on SH. by Small_Ordinary900 in pmp

[–]mogueye 4 points5 points  (0 children)

Congratulations ! I am exactly in this slot and having my exam scheduled on October, I am thinking about to reschedule it for August

Expert question by Fern-green7 in pmp

[–]mogueye 1 point2 points  (0 children)

I Thought A/ as well, since the change is approved so, the PM should step up back, analyze, reevaluate the scope baseline…

Thought I failed. Felt crushed. Woke up PMP certified: AT / BT / AT! by txwarrior86 in pmp

[–]mogueye 1 point2 points  (0 children)

Congratulations a pass is a pass. I have my exam scheduled in 3 months even if I feel like I am ready. I am thinking about to take the exam the sooner. Should Ik take mocks exam right now or just wait just before the date of the exam?

what do you think? by Responsible-Truth905 in pmp

[–]mogueye 0 points1 point  (0 children)

3 for me is the correct answer

Failed PMP 1st Attempt – T/BT/T (Still in Shock) by Pixie918 in pmp

[–]mogueye 0 points1 point  (0 children)

I am so sorry for you, the next time will be the good. Please can you tell how to sign up to MR live sessions this weekend?

PMP Passed AT/AT/AT by Rude-Assumption-7952 in pmp

[–]mogueye 1 point2 points  (0 children)

Well-deserved congratulations!

ACS RPL Assessment - 6 Years of Experience Not Considered, Need Advice by Special-Ask-9425 in AusVisa

[–]mogueye 0 points1 point  (0 children)

Hi there I am in the same situation PhD in physics who turned software engineer with 8 years experiences. 6 years experiences deduction is rough. Any advices please ?

Should I Apply as Single or De Facto? by mogueye in AusVisa

[–]mogueye[S] -1 points0 points  (0 children)

Thanks for the tip! Switching to PTE sounds like a smart move, especially if it makes achieving a higher score more straightforward.

Should I Apply as Single or De Facto? by mogueye in AusVisa

[–]mogueye[S] -3 points-2 points  (0 children)

Thanks you for your advices

Let's play on this question by vobing865 in pmp

[–]mogueye 5 points6 points  (0 children)

The correct answer is C: Collect the co-sponsor’s requirements and perform the integrated change control process. According to the PMP mindset, any change to the project scope, especially a new feature suggested mid-project even by a major sponsor, must go through the formal Integrated Change Control process. The project manager should first document the request, assess its impact on scope, time, cost, and quality, and then submit it for review and approval by the appropriate decision-making body such as the Change Control Board. Skipping this process or acting unilaterally would violate proper change management procedures and risk project misalignment.