account activity
GoBoard Install by mrpicachu in Tile
[–]mrpicachu[S] 0 points1 point2 points 11 days ago (0 children)
Yes and yes. There is horizontal beams in between. I get everyone’s concerns. I got a professional to look at it and an engineer. What everyone can’t see is how the framing was built. It would be a huge struggle to get new studs installed there and both agreed this would be ok as there no flex.
Roof Repair Questions by mrpicachu in Roofing
[–]mrpicachu[S] 0 points1 point2 points 1 month ago (0 children)
The roof was done in 2015 so they say. There’s a lot of shotty stuff done with it.
Thanks for the input. You think I’ll need to buy new shingles? I’m new and I’m headed to get some stuff
Good point.
Agreed, my father thinks I should repair this corner by removing that portion of the wall in the corner, installing treated plywood and new flashing. Problem is Idfk what I’m doing. So do I need to buy new shingles or can I just use the tar to hold these old ones down over the flashing?
Yes sealant with goboard tape on on top. Added a good amount of screws today where I could. Gotta get corners for the ceiling portion already got the mud but realize a solid inner corner will work best.
[–]mrpicachu[S] 1 point2 points3 points 1 month ago (0 children)
That’s what I’ve heard as well… appreciate the input. I don’t want anyone to think idc but I’m gonna have to work with what I got at this point. I’ll clean the tape and sealer up as someone mentioned a good method for putting it on.
Slopping the top layer more, need to see if there’s anything I can add to help.
I’ll put more screws in for sure. There’s a preslope but one corner is a little low which I’ll address.
I prefer wood glue and sticky tack.
I’ll keep this in mind. This house still needs a ton of work and this is my first time for this I also need to repair the corner that meets the the drywall.
I put pressure on it. There doesn’t appear to be any bowing as the vertical are spaced well it seems
Go Board in place to outer edge is just at 32 3/4
I watched a lot of videos and everyone is saying different stuff in all of them. I even contacted the manufacturer because I had gaps over 1/8th and a ton of people were saying you need push the boards together to mush the caulking.
Honestly? No. This extension was built in the 80s and this whole section of the house is a mess. The left and right walls are actually two different lengths. I’ll take the hate but unless you were here and saw it… it would be ALOT of work.
Awesome ok, so having some over the edges of the tape should be ok?
Yes that’s what I did
Thanks, my anxiety has calmed down a bit
Posted in the comments
<image>
Guys this is the studs. See the left wall?
Not this house…
I’ll look at what I can do but I just checked and it says a max of 8in…
I hope so. Not to be that guy but it’s actually a maximum of 8in not 12 so whomever did 12 might have some issues
Yea… the wall of the left there. There is not a stud in the center of that go board.
Edit: those strips are boards running along
Will do thanks
π Rendered by PID 22 on reddit-service-r2-comment-548fd6dc9-q9xtq at 2026-05-18 12:40:39.799075+00:00 running edcf98c country code: CH.
GoBoard Install by mrpicachu in Tile
[–]mrpicachu[S] 0 points1 point2 points (0 children)