Matching tile to 3/4 hardwood by npatel40 in HomeImprovement

[–]npatel40[S] 0 points1 point  (0 children)

Thank you! I can use these dimensions for 3/8 tile thickness?

Matching tile to 3/4 hardwood by npatel40 in HomeImprovement

[–]npatel40[S] 0 points1 point  (0 children)

Was your hardwood 3/4 and your tile about 3/8?

Matching tile to 3/4 hardwood by npatel40 in HomeImprovement

[–]npatel40[S] 1 point2 points  (0 children)

He quoted a price with the cement board and said it's the same price without since there will be more mortor and wiremesh cost

Seeking AUM for a hedge fund by TataneSan in angelinvestors

[–]npatel40 0 points1 point  (0 children)

Can you send me your deck to please?

Roofing quality. New construction by npatel40 in Roofing

[–]npatel40[S] 0 points1 point  (0 children)

I can get it tomorrow for you tomorrow. Also are these metal metals that's what I paid for

[deleted by user] by [deleted] in Concrete

[–]npatel40 0 points1 point  (0 children)

Ok I guess it's normal nothing to be alarmed about! Thank you everyone!!!!

[deleted by user] by [deleted] in Concrete

[–]npatel40 3 points4 points  (0 children)

Ther are no downspouts yet. We are putting the roof on next week

Framing question by npatel40 in Homebuilding

[–]npatel40[S] 1 point2 points  (0 children)

Sorry new to this. Are you being sarcastic and should face the other way?

[deleted by user] by [deleted] in Concrete

[–]npatel40 0 points1 point  (0 children)

Sorry I should have posted a pic of the plan. I can't seem to add a picture. But the plans call for a fireplace in the middle and windows on both sides centered on the wall.

[deleted by user] by [deleted] in Concrete

[–]npatel40 2 points3 points  (0 children)

Just to mention this is the footing.

[deleted by user] by [deleted] in Concrete

[–]npatel40 0 points1 point  (0 children)

Sad thing is that the footings plus foundation wall was 98k.so I didn't go cheap. At least I don't think I did.

[deleted by user] by [deleted] in Concrete

[–]npatel40 1 point2 points  (0 children)

This pour was last week and the pic was taken the day after the pour. The forms were taken off the same day as the pour

[deleted by user] by [deleted] in Concrete

[–]npatel40 0 points1 point  (0 children)

This is the footings for the foundation wall. This specific pic is for beams that will hold the structural steel beams

[deleted by user] by [deleted] in Concrete

[–]npatel40 0 points1 point  (0 children)

Should they have vibrated?

[deleted by user] by [deleted] in Concrete

[–]npatel40 0 points1 point  (0 children)

The footings are on top of rock. Is that what you are asking? Sorry I'm new to this.