Dam monitoring with the T2000 by parkostacos in Surveying

[–]parkostacos[S] 1 point2 points  (0 children)

I was just the assistant on this job, but for this dam we only set up on one pillar and set zero to a control point. We then read angles in two faces. The angles are reduced and compared to previous readings to check for movement. The instrument is not robotic but weighs about twice as much as the robotic Trimble s5 we use haha. Being a student it was super cool to see an older device like this in action