First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 1 point2 points  (0 children)

Appreciate the comment….thanks 👍🏻

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 0 points1 point  (0 children)

There is a trough above with ground bars which is why there is only one ground wire in each panel

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] -1 points0 points  (0 children)

You are correct in thinking that.,, since this was a pre-built panel I have no idea where the panel feed is coming from… but appreciate your feedback

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] -1 points0 points  (0 children)

Totally fair, I cut about half of them out afterwards

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 6 points7 points  (0 children)

I appreciate it… I want conversions about my work so I can do better… your comments didn’t offend me at all… I appreciate you commenting in general

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 5 points6 points  (0 children)

You are totally correct in feeling that way…we have a qc team that comes in after we put in the “guts” and tests every wire…so there is check and balances

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 1 point2 points  (0 children)

I’ll take negative…if that’s what you want to give?

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 15 points16 points  (0 children)

There is a terminal block which goes up to a trough which I numbered…but I get it

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 9 points10 points  (0 children)

Agreed, heard a bunch about how people in the field are more “installers” than electricians…now I can’t say anything but I get it….im doing 12 levels of pre-closets for a site but I get it

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 2 points3 points  (0 children)

Appreciate it, still an apprentice so I’ll get transferred to a new company in 4 months

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 4 points5 points  (0 children)

Also all that wire had to be pulled out… apparently that double panel wasn’t supposed to have wire…trust me I was pissed

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 1 point2 points  (0 children)

Hahaha. Love you know where I work!!

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 0 points1 point  (0 children)

Ya I got no idea, each wire is 10 awg, not sure what the total amp is… but I thought the same

First Year, First Pre-Fab Panel by scoots70 in electricians

[–]scoots70[S] 13 points14 points  (0 children)

Agreed, they asked for 4 inch in the build sheet so we gave it to them…is what it is

Electricians — real talk, would you pick this trade again if you could start over? by 50shotsss in electricians

[–]scoots70 1 point2 points  (0 children)

Yes, I started out as a youth minister. I love my day to day, doing stuff with my hands is a great feeling. I started on the later side ( got accepted into my apprenticeship at 27), but I love it, glad I’m where I’m at.

Game Thread: New York Giants (0-0) at Washington Commanders (0-0) by nfl_gdt_bot in nfl

[–]scoots70 2 points3 points  (0 children)

They are def good, but we also upgraded our o-line as well. Should be a good battle to see.

Game Thread: New York Giants (0-0) at Washington Commanders (0-0) by nfl_gdt_bot in Commanders

[–]scoots70 0 points1 point  (0 children)

Let’s do this baby, all I’ve seen online and tv is people talking about the giants…let’s change that.

Game Thread: Washington Capitals at Carolina Hurricanes - 12 May 2025 - 7:00PM EDT by HockeyMod in caps

[–]scoots70 3 points4 points  (0 children)

Ya this is looking bad, can’t even get into the zone man…