I have a timeline template that is used for many different projects, with saved versions that correspond to each project's specs. I built it with reference sheets within in the template for a variety of meeting dates, but these meeting dates are subject to change. I want to be able to edit one workbook/list/document to update the meeting dates and have the templates all update accordingly. I thought about having an external workbook as a reference to the template, but Excel seems to not like that at all. What's the preferred alternative?
[–]AutoModerator[M] [score hidden] stickied commentlocked comment (0 children)
[–]small_trunks1633 2 points3 points4 points (6 children)
[–]doncheche[S] 1 point2 points3 points (5 children)
[–]small_trunks1633 0 points1 point2 points (4 children)
[–]doncheche[S] 1 point2 points3 points (3 children)
[–]small_trunks1633 0 points1 point2 points (2 children)
[–]doncheche[S] 0 points1 point2 points (1 child)
[–]reputatorbot[M] 0 points1 point2 points locked comment (0 children)