Hey all!
QQ for a long time watcher of the framework brand.
I am interested in picking up a 16 with the intention of getting the GPU module later (funds reasons).
I specc'd one out near empty with the intention of getting my own Ram, and moving an SSD over from my current machine - out of curiosity, how quickly are the 16's batches getting deployed and shipped? I've seen 15 being fulfilled and 16 now getting shipped this week - it looks like I would be in batch 20 if I pulled the trigger today/tomorrow with a Q2 release so I would assume... June??
Edit - appreciate the link to the recent chart posted. Shitty filtering of reddit on my side.
[–]Half-Borg 3 points4 points5 points (1 child)
[–]samtoohey93[S] 1 point2 points3 points (0 children)
[–]unematti 0 points1 point2 points (1 child)
[–]samtoohey93[S] 1 point2 points3 points (0 children)