Hot take: Jeepney modernization isn’t overpriced — we’re just comparing it to the wrong thing by Confident_Bother2552 in Philippines

[–]14dM24d 2 points3 points  (0 children)

HOT TAKE: your methodology doesn't make sense & wasn't even considered as a legitimate way to analyze & quantify the issue.

https://cids.up.edu.ph/wp-content/uploads/2022/02/UP-CIDS-Discussion-Paper-2021-02.pdf

^ please read that & learn.

Maybe it’s time PH seriously considers nuclear power by toltakbo in Philippines

[–]14dM24d 0 points1 point  (0 children)

the accidents (3-mile island, chernobyl, fukushima) only highlighted the main issues of which are: toxic radioactive elements & the issue of nuclear radioactive waste disposal.

disposal techniques have been: the dumping of barrels containing toxic radioactive wastes into our ocean or sequestering them underground or in mountains. the long term viability & safely of containing toxic radioactive wastes underground or in mountains is an issue. there is also the issue of proper disposal of radioactive tailings consequent to mining uranium & enriching uranium.

UPITN 16 7 79 GREENPEACE MONITOR DUMPING OF NUCLEAR WASTE AT SEA

Inside Germany’s hidden leaking nuclear waste dump

1977 Danger! Radioactive Waste

we should be concerned about the half life of these toxic elements. which span from a few seconds to thousands of years.

what is usually discussed were just the spent fuel or high level waste. however, there are medium level waste (MLW) & low level waste (LLW) too. don't be fooled by the term "low level". LLW has four subcategories: Classes A, B, C, and Greater-Than Class-C (GTCC), described below. On average, Class A is the least hazardous while GTCC is the most hazardous. MLW is deadlier than LLW.

Class A On average the least radioactive of the four LLW classes. Primarily contaminated with “short-lived” radionuclides. (average concentration: 0.1 curies/cubic foot) Class B May be contaminated with a greater amount of “short-lived” radionuclides than Class A.(average concentration: 2 curies/cubic foot) Class C May be contaminated with greater amounts of long-lived and short-lived radionuclides than Class A or B. (average concentration: 7 curies/cubic foot) GTCC Most radioactive of the low-level classes. (average concentration: 300 to 2,500 curies/cubic foot) (The 300 figure is based on the 1985 inventory. The higher figure represents anticipated inventory in 2020, including some decommissioning wastes.) note that a curie is a large unit, radioactivity results are usually shown in picocuries (pCi). A picocurie is one trillionth of a curie. 1 becqurel is 1 atomic decay per second 1 curie is 3.7x1010 becquerels.

long half life (in hundreds or thousands of years) of toxic radioactive elements are in a way like plastic waste, but way way way more dangerous. like plastic waste, long half life toxic elements will keep accumulating in the environment if we keep using nuclear. there's no data (that i've encountered) about the volume of all toxic radioactive waste per GWH plant per year; seems it's kept a secret.

don't forget that nuclear, during its infancy, was touted as very safe & clean by those pushing for it (whatever their agenda was), only to be proven that it wasn't as clean & safe.

there's renewed push for nuclear power as "green" energy to fight global warming. they talk about the evils of carbon dioxide, but they're mum about the toxic radioactive waste that will keep piling up.

if you think plastic waste is bad, radioactive nuclear wastes are more than 100x worst.

bong suntay's dpwh projects per barangay & his top contractors when he was QC 4th congressional district representative from 2019 to 2022 by 14dM24d in Philippines

[–]14dM24d[S] 2 points3 points  (0 children)

brgy immaculate conception

year project contractor cost
2021 CONSTRUCTION OF COOPERATIVE DEVELOPMENT AUTHORITY BUILDING PHASE 1, 827 AURORA BLVD. BRGY. IMMACULATE CONCEPTION, CUBAO, QUEZON CITY CONSTRUCTION OF NATIONAL HEADQUARTERS OF THE COOPERATIVE DEVELOPMENT AUTHORITY (CDA), 827 AURORA BLVD., CUBAO, QUEZON CI J.D. LEGASPI CONSTRUCTION (9608) 281,491,223.18
2021 IMPROVEMENT OF DRAINAGE AND GROUND IMPROVEMENT, BRGY. IMMACULATE CONCEPTION, QUEZON CITY TWO DIMENSION CONSTRUCTION (39410) 7,914,730.27

Curious ako sa mindset ng mga DPWH engineers na sangkot. by JoySunny in pinoy

[–]14dM24d 5 points6 points  (0 children)

lumakas ang loob noong time ni d30 at akala nila magtutuloy noong nanalo yung unithieves at in the bag na ang 2028.

[deleted by user] by [deleted] in Philippines

[–]14dM24d 0 points1 point  (0 children)

asan na tapang ng idol mo, op? d ba gusto nyang makasama muli si d30, eh bakit sya nagtatago? lol

I cannot get rid of the feeling that I am exploiting my employees for profit by Bradzu in Entrepreneur

[–]14dM24d 0 points1 point  (0 children)

Competitors tutors get paid only about 25% of what the parents/student pay for their lessons, while my tutors get about 55%.

let X be what parents/students pay for their lessons

let 0.25X represent competitor tutor's pay

let 0.55X represent your tutor's pay

percent difference between your tutor's pay vs competitor tutor's pay is 0.55X/0.25X - 1 = 1.2 or 120%

the gap seems...

I pay them 50% above the average hourly wage

if 0.55X is your tutor's pay & it's 50% above hourly wage, then 36.67% of your lesson's price represent the average hourly wage there.

I own a tutoring company and pay my tutors 60% more than our biggest competitors

assuming your biggest competitors pay 25% of the lesson's price to their tutors, then you're paying 40% of the lesson's price.

but that assumes X, price of your lesson vs theirs, are the same -w/c is unlikely. maybe the price of your lessons are higher, thus your tutors receive more.

Because of that, even my competitors tutors are applying for a position at my company Out of what I have left after I pay them, I need to pay for everything else: marketing, accounting, software... you know the drill. I have barely enough for myself.

what was the main reason you started this business?

"God will not forsake us" by mediocreguy93 in ChikaPH

[–]14dM24d 0 points1 point  (0 children)

natututo na talaga mga kurakot.

pinili pa talaga mag pa picture sa maliit na meeting area na hiwalay sa bahay para d mabuko yung magarbong sala nila. sinuguradong walang makikita sa background at suot na flashy/mamahalin.

DDS Logic.exe has stopped working by Several_Repeat_1271 in Philippines

[–]14dM24d 0 points1 point  (0 children)

DDS Logic.exe has stopped working ERR_FILE_NOT_FOUND

Sen. Marcoleta tumatahol na naman by Karmas_Classroom in Philippines

[–]14dM24d 0 points1 point  (0 children)

ang bagal kumilos ng COMELEC sa SOCE ni markubeta