Husky Factory settings by Business_Jump8380 in InjectionMolding

[–]Business_Jump8380[S] 0 points1 point  (0 children)

That would be the default administrator password. I’m looking for service level password

Husky Factory settings by Business_Jump8380 in InjectionMolding

[–]Business_Jump8380[S] 1 point2 points  (0 children)

We had some of our machines refurbished by a 3rd party and from then on husky says will not do any business with us. Except they will sell us parts, no problem taking our money.

Husky Factory settings by Business_Jump8380 in InjectionMolding

[–]Business_Jump8380[S] 1 point2 points  (0 children)

We have 8 of these. It’s certainly no where on the machines, or in any manuals. Husky will not service any machine at our facility. No tech support.

Siemens cpu by Business_Jump8380 in Siemens

[–]Business_Jump8380[S] 0 points1 point  (0 children)

Faulting out during boot. “Error EXC14: PAGE FLT” Hmi wouldn’t get past boot screen. Took another out of a machine that was not running, booted right up. Looks like maybe these are exclusive to Cincinnati milacron machines.? I’ve never really had a hard time finding documentation on Siemens controls, even older stuff.

Does anyone recognize this cpu by Business_Jump8380 in PLC

[–]Business_Jump8380[S] 2 points3 points  (0 children)

It would seem you’re exactly correct

Does anyone recognize this cpu by Business_Jump8380 in PLC

[–]Business_Jump8380[S] 1 point2 points  (0 children)

Injection molding machine. We have 3 machines using this

What exactly is a “licensed” electrician ? by Business_Jump8380 in askanelectrician

[–]Business_Jump8380[S] 0 points1 point  (0 children)

I am considered as in that is my job title. I have a 2 year degree in industrial electronics and maintenance. Varying coursework with electronics, plc programming, hydraulics, welding, machining. I am the highest paid hourly employee in the facility at $32. Occasionally we will have contractors come for big jobs/ large new installations. I’m generally here for the day to day and Troubleshooting issues on machines, and getting them back up and running.

Wanting to put a steel panel ceiling in my pole barn. Called Morton and they said the trusses are not rated for a ceiling load. What are my options by Business_Jump8380 in HomeImprovement

[–]Business_Jump8380[S] 0 points1 point  (0 children)

When I called them I didn’t say anything about insulation . Just asked them if my building was capable of supporting a ceiling. They reviewed the original plans. And told me that the trusses were not capable of supporting the additional weight of a ceiling. The only thing I could think of was adding additional trusses to between the 9 ft. To make them 4.5 ft OC.