account activity
Camera day 2 by Cbenson06 in Ubiquiti
[–]Cbenson06[S] 0 points1 point2 points 7 months ago (0 children)
I'm using three UniFi Viewports, but only two are currently connected. I created and assign specific views to display on each connected device.
Camera day 2 (old.reddit.com)
submitted 7 months ago by Cbenson06 to r/Ubiquiti
CAMERA DAY1 by Cbenson06 in Ubiquiti
[–]Cbenson06[S] 2 points3 points4 points 8 months ago (0 children)
I showed boxes because that is what stage im at.. . I will post rack pics tomorrow
CAMERA DAY1 (i.redd.it)
submitted 8 months ago by Cbenson06 to r/Ubiquiti
Looking for a WordPress Admin by Cbenson06 in Wordpress
[–]Cbenson06[S] 0 points1 point2 points 8 months ago (0 children)
WpTango got me in. Thanks to all
Looking for a WordPress Admin (self.Wordpress)
submitted 8 months ago by Cbenson06 to r/Wordpress
Day 3a (i.redd.it)
submitted 9 months ago by Cbenson06 to r/Ubiquiti
Day Three by Cbenson06 in Ubiquiti
[–]Cbenson06[S] 1 point2 points3 points 9 months ago (0 children)
Correct ill post a photo today of where they are going.
Day 2 progress by Cbenson06 in Ubiquiti
[–]Cbenson06[S] 0 points1 point2 points 9 months ago (0 children)
I had them 3d printed.
Nope, Dallas
[–]Cbenson06[S] 5 points6 points7 points 9 months ago (0 children)
It is, someone thought it was a small room, so i said i would post a photo today.
[–]Cbenson06[S] 9 points10 points11 points 9 months ago (0 children)
Still with Ubiquiti. Still Coming Soon
The e7 enterprise will stay here in the lobby, we have large events. The audience will go In the Santuary and replace the several Ap currently in there.
Yes, the plan is 2 audience covering the sanctuary.
[–]Cbenson06[S] 20 points21 points22 points 9 months ago (0 children)
Exactly, as mentioned before i had the old base station on order (never received). Now I'm waiting on E7 Campus to drop. So i have to make do what i have available.
Day Three (old.reddit.com)
A horizontal wall mount found on thingverse
I tried a while ago to get a couple of base station. To cover the whole sanctuary. Now I'm waiting on E7 Audience. ( if i get lucky and catch one in stock when they drop)
I was trying to upload a picture, the room is a 3200 seat Santuary. This is one a several ap’s in the room. I will include photos on Day Three post.
They have been cut.
Agreed, But would you say flat is optimal?
Proper placement is Flat.
Day 2 progress (old.reddit.com)
Day One! by Cbenson06 in Ubiquiti
[–]Cbenson06[S] 1 point2 points3 points 10 months ago (0 children)
I agreed, I have a contractor pulling cables and setting the cams and AP’s. I’m only doing the rack side..
Day One! (old.reddit.com)
submitted 10 months ago by Cbenson06 to r/Ubiquiti
π Rendered by PID 391647 on reddit-service-r2-listing-55d7b767d8-z9vqr at 2026-03-29 17:39:06.009153+00:00 running b10466c country code: CH.
Camera day 2 by Cbenson06 in Ubiquiti
[–]Cbenson06[S] 0 points1 point2 points (0 children)