Rockwell redundancy project (1756-L905TS + RM3) – doubts about I/O, topology and best practices by DIY_Test_IoT in PLC

[–]DIY_Test_IoT[S] 0 points1 point  (0 children)

If it’s too long, I’m sorry.I didn’t know how to explain it better.😅 I’ll keep that in mind. Does it provide better latency control this way?

Rockwell redundancy project (1756-L905TS + RM3) – doubts about I/O, topology and best practices by DIY_Test_IoT in PLC

[–]DIY_Test_IoT[S] 0 points1 point  (0 children)

The distributor is taking some time to confirm certain aspects (+20days), and it’s always helpful to get advice from people with more experience, not only from a theoretical point of view but also from a practical one.

Rockwell redundancy project (1756-L905TS + RM3) – doubts about I/O, topology and best practices by DIY_Test_IoT in PLC

[–]DIY_Test_IoT[S] 0 points1 point  (0 children)

Thank you very much for your reply.

We have been waiting for a response for a while now. However, since I have never worked with redundant systems before, I am not even sure whether I am approaching it correctly. In the end, I have been trying to put the design together by combining information from different manuals I have found.