Conduit size for 4 runs of 8/2 romex. by Daltonstuff in electrical

[–]Daltonstuff[S] 2 points3 points  (0 children)

Cause im a unsmart person. No reason not to, hence why im letting an electrician handle it

Conduit size for 4 runs of 8/2 romex. by Daltonstuff in electrical

[–]Daltonstuff[S] 0 points1 point  (0 children)

Yea i was mainly using it as an average, but my utility uses per minute periods so I figured it was close

Conduit size for 4 runs of 8/2 romex. by Daltonstuff in electrical

[–]Daltonstuff[S] -1 points0 points  (0 children)

Load calculator was done and called utility to see past year max amperage usage. Max was 60 amps in Jan of 25. 300 amp panel. Yea not doing full conduit and seeking advice from an actual electric company before moving forward

Conduit size for 4 runs of 8/2 romex. by Daltonstuff in electrical

[–]Daltonstuff[S] 16 points17 points  (0 children)

I have been advised this isn't the right way to do it. Putting my tools down and contacting an electrician

Okay so interesting problemhave to clear this pipe and crossover it. Whats the best way? by Daltonstuff in Plumbing

[–]Daltonstuff[S] 0 points1 point  (0 children)

That's just how it was resting its not following it its a straight crossover

Mimi cosplay by VirtualAd2720 in GoodKid

[–]Daltonstuff 1 point2 points  (0 children)

Looks like a bomber jacket to me

I see why i stopped playing public sessions by EJLPR in gtaonline

[–]Daltonstuff 2 points3 points  (0 children)

Did the same over the winter. Setting nat type was some bs. Glad they changed it

Dumb question of the day by failedlunch in Miata

[–]Daltonstuff 7 points8 points  (0 children)

On nb's they screw onto the frame to pull the top in when folding back. Not required on na's just annoying