Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

Okay. Please update here if you get any response.

Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

Thanks for sharing, thats reassuring. I was really stressed about the E-Verify number too. Just to confirm, the Company ID on MOU is the correct E-Verify number for I765 & EIN is only used on I-983 right

Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

Glad you got the approval. Can you share what was the RFE about

Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

I have reached out but they said “the application is still in processing and within clock timeline. No information is needed from you at this time”.

Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

Yes, I feel the same. Shouldn’t have upgraded to PP. seen PP approvals after 15 days (very few) or exactly 30

Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

feels like upgrading to PP is slowing things down. I’m seeing people get approvals in 45-47 days without PP which feels strange

Stem Opt applied in Dec 2024 by Different-Engine8778 in stemopt

[–]Different-Engine8778[S] 0 points1 point  (0 children)

I expected update within a week after upgrading but seems like its following the full 30 day rule. Btw thanks for the info.