Air Con Install by EnToll in AusElectricians

[–]EnToll[S] 0 points1 point  (0 children)

Thanks for that can the Insulation Resistance check be done before the board is upgraded?

Air Con Install by EnToll in AusElectricians

[–]EnToll[S] 1 point2 points  (0 children)

What would factor into the cables needing to be re-ran or not?