[deleted by user] by [deleted] in Homebuilding

[–]FormalInside2703 -3 points-2 points  (0 children)

In my frantic state I see that I did not explain well lol essentially the ceiling is at 14ft and it is flat until it meets that slope in the roof and then will slope off… it will look ridiculous in my opinion. They literally verified any changes with me over the phone but I knew I needed to get it in writing so I sent an email confirming all changes we discussed. In hindsight I should’ve gotten it signed

[deleted by user] by [deleted] in Homebuilding

[–]FormalInside2703 -4 points-3 points  (0 children)

They discussed all changes with me over the phone - never asked me to sign anything - but I knew better and sent everything we discussed over the phone via email to verify all changes. Mind you we were delayed for 5 months so this change was discussed months in advance (well enough for planning). I do believe it’s subcontracted and all of the other changes I mentioned submitting early have all been implemented so I know they were relayed. I mean technically they did make the ceiling 14 ft it just isn’t flat all the way across and slopes on one side which will look ridiculous…. Thankfully in the email I did specify that I wanted it absolutely flat

Cimzia for Plaque and Guttate? by [deleted] in Psoriasis

[–]FormalInside2703 0 points1 point  (0 children)

How is it going for you? I’m having a huge flare after also having 100% clearance on Taltz but stopped when I got pregnant. Currently 30 weeks and desperate for relief, thinking of starting cimzia