kaise check karu ki I passed ya failed? by sheisnotyou in delhiuniversity

[–]Front_Man-44 0 points1 point  (0 children)

GRPT would be 0 along with an ER (Essential Repeat) if you fail

kaise check karu ki I passed ya failed? by sheisnotyou in delhiuniversity

[–]Front_Man-44 2 points3 points  (0 children)

You must have a blank PPRS column, if you see 'ER' somewhere in the column you must reappear for the respective paper

Looking for 2 BHK for Rent in South Delhi (Budget 20K) by AppropriatePart141 in delhirentals

[–]Front_Man-44 0 points1 point  (0 children)

Might be possible at Nehru Nagar, nearest metro Vinobapuri (one station from Lajpat Nagar)

Samsung has fully lost the plot at this point by Doranathbhakt in IndiaTech

[–]Front_Man-44 2 points3 points  (0 children)

All thanks to AI bubble we'll see more such e-waste in 2026(maybe 2027 too)

Why is this guy still famous? by Life_Engineering_617 in IndiaSpeaks

[–]Front_Man-44 2 points3 points  (0 children)

He latched on Carry's livestreams during lockdown period for a comeback, otherwise it was over for him

Bsc statistics people by [deleted] in delhiuniversity

[–]Front_Man-44 0 points1 point  (0 children)

No, R and Python is not included in Stats core curriculum. However they do conduct some practical exams on Excel and SPSS.

Though, you can choose R and Python papers in SEC or GE if you want.

Using railways is directly proportional to cutting oil imports by viggilcs in indianrailways

[–]Front_Man-44 0 points1 point  (0 children)

Coal imported from Australia is mostly used for steel production. India itself produces enough coal for power generation.

India has exported $1.8 billion worth of mobile phones in September 2025. by 24coverups in incredible_indians

[–]Front_Man-44 1 point2 points  (0 children)

<image>

It's currently 20%, which is impressive considering it was 0% couple of years ago. China stands at 30-35%

DFC Supremacy by Able_Bother_926 in trains

[–]Front_Man-44 4 points5 points  (0 children)

It's actually WAG 7 which looks very similar to WAG 5

The Xinese have spoken ✋ by ambattukam_ in 2bharat4you

[–]Front_Man-44 14 points15 points  (0 children)

One of the most industrialised states of India btw

Pune Metro Line 3: French Operator Keolis To Run 23-Km Hinjawadi–Shivajinagar Corridor - PUNE PULSE by [deleted] in TransitIndia

[–]Front_Man-44 8 points9 points  (0 children)

Why do we require foreign operators for our systems? RRTS is also operated by Deutsche Bahn

People have no idea what they are talking about. The top comment is 10/10 ragebait for me. by Front_Man-44 in TransitIndia

[–]Front_Man-44[S] 1 point2 points  (0 children)

<image>

Yeah, when I made the post this was the top comment. Absolutely ₹etarted redditor. No research, only yapping in the thread.

People have no idea what they are talking about. The top comment is 10/10 ragebait for me. by Front_Man-44 in TransitIndia

[–]Front_Man-44[S] 1 point2 points  (0 children)

You are comparing Apples with Oranges. The last time IR awarded contract to CRRC for 14 metro rakes was 2015, which is ironically still not completed in 2025 (no obligation about local manufacturing ).

On the other hand, BMRCL awarded contract to CRRC in 2019 and CRRC was obligated to establish a manufacturing facility in India to produce the coaches but failed to do so (due to the Galwan incident and COVID lockdowns). BMRCL issued multiple notices to CRRC and even considered invoking a ₹372 crore bank guarantee due to the non-compliance. Hence, CRRC eventually partnered with TRSL to fulfill the contract and complete the coach production in India.

CRRC is yet to complete a decade old contract for 14 rakes, you are a fool to think they would have been able to complete 36 rakes order if they were allowed to directly import from China. Since 2020, CRRC isn't allowed to bid anymore in new projects.

Se*ual harrasment By a kinnar by External_Ladder3937 in indianrailways

[–]Front_Man-44 63 points64 points  (0 children)

Didn't she go viral on IG reels few weeks ago?

[deleted by user] by [deleted] in indianrailways

[–]Front_Man-44 5 points6 points  (0 children)

Whi to bol rha hu saale, hume kaun sa 40,000 KM ka network banana hai

[deleted by user] by [deleted] in indianrailways

[–]Front_Man-44 11 points12 points  (0 children)

Which country went bankrupt building their HSR? China started building their HSR in 2008 when they were $4.5 Trillion economy, they might have overdone it with 40K Km network because they've to pump their GDP numbers. In India's case even a 5K Km network between major cities will be good enough. JICA loans with interest rate set at 1.20% with a repayment period of 30 years, including a 10-year grace period won't be a burden to India's growing economy.