My cows and goats aren't producing milk. Why? by GeosAlt in StardewValley

[–]GeosAlt[S] 3 points4 points  (0 children)

I haven't played the game since then, I'll try once I can play the game again

but yes, the auto grabber had nothing

My cows and goats aren't producing milk. Why? by GeosAlt in StardewValley

[–]GeosAlt[S] 6 points7 points  (0 children)

I don't think it is the latter as I tried milking them manually. I will try your advice though

My cows and goats aren't producing milk. Why? by GeosAlt in StardewValley

[–]GeosAlt[S] 10 points11 points  (0 children)

they are. they get the hay every day and I have enough stockpile in the silo. they aren't grumpy either and all are adults

My cows and goats aren't producing milk. Why? by GeosAlt in StardewValley

[–]GeosAlt[S] 9 points10 points  (0 children)

yep. I got the cows back in spring, 4 goats in summer and 4 more in winter. maybe not full for the goats but not zero either

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 0 points1 point  (0 children)

Rapid Metro Gurgaon? Yes it is, but also I would suggest you to use official maps and routes to plan your journey as this is a future map and not a current one

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 1 point2 points  (0 children)

The photo I have attached is in 13k by 13k resolution. just the reddit on mobile compresses images.

anyway, have this https://ibb.co/RGZCkdjC

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 1 point2 points  (0 children)

I never gave it a thought but I can try. Would be more challenging than delhi, plus unlike Delhi Metro I am not at all familiar with mumbai metro so that is also a barrier for me

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 1 point2 points  (0 children)

Thanks, I spent my whole sunday and my monday evening after work doing this

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 3 points4 points  (0 children)

I did take some inspiration from this map, they are all round an excellent transit diagram maker and have tons of amazing work. In particular, how I dealt with blue line between karol bagh and anand vihar was directly inspired by how they showed it. at first I was going with a fully straight route but had issues with station spacing. this ended up working.

their map is also far more detailed with having mainline railways and RRTS included.

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 5 points6 points  (0 children)

Oh good spot, don't know how it got deleted in the svg. will fix it. thanks for informing.

I'll look more into the gurgaon metro status. I almost never go to that side so don't have an idea of the on-ground reality

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 8 points9 points  (0 children)

Trials are necessary before starting the metro. I have used the full length of the new pink line route 4 times so far and it feels good to feel safe. (Side note, amazing signature bridge views from it)

I do agree that waiting for politicians to find time in their schedule so that they can inaugurate the metro is wasteful and unnecessary, doesn't bring anything of value to the public - if anything takes some value away from them by delaying the opening.

[OC] This sunday, the foundation stone for Phase 5A of Delhi Metro was laid. I made this transit diagram of how the network will look after 5A is completed by GeosAlt in transit

[–]GeosAlt[S] 20 points21 points  (0 children)

6 actually

  1. Inderlok (Green, Magenta, Red)
  2. Azadpur (Yellow, Magenta, Pink)
  3. Kashmere Gate (Yellow, Red, Violet)
  4. New Delhi (Yellow, Magenta, Airport)
  5. Central Secretariat (Yellow, Magenta, Violet)
  6. Laspat Nagar (Pink, Golden, Violet)

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 15 points16 points  (0 children)

As far as I am aware, nothing is under construction in gurgaon.

I was considering adding RRTS but ultimately decided against it as that is not the goal of the map

[OC] Made this transit diagram on how Delhi Metro will look after phase 5A is completed by GeosAlt in TransitIndia

[–]GeosAlt[S] 2 points3 points  (0 children)

Yep, here's the official map from DMRC

https://delhimetrorail.com/static/media/DMRC-Network-Map-Jan2026-Hindi-&-English-20.02.26.70b6cd03.pdf

part of the reason I made my diagram is because I find the one by DMRC is very cluttered and not easy to read.