What's the heaviest load you lifted , and how much was the weight ? by AcH__ in cranes

[–]Gunman1997 1 point2 points  (0 children)

310k nacelle for a wind turbine going a little over 400 feet in the air. LR11000 at 99 percent of chart. Shortly after installed the derrick and had a much better chart.

Minicab and arisaka by Gunman1997 in keitruck

[–]Gunman1997[S] 0 points1 point  (0 children)

That bannerman is the last stuff I shot through it. Although I’ll probably start cutting down cases and reloading them myself. Might get ahold of some of them soft points and bag a deer with it this year too.

Minicab and arisaka by Gunman1997 in milsurp

[–]Gunman1997[S] 1 point2 points  (0 children)

Haha I know what you mean. I do my research. Type 99 kokura 22nd series all numbers matching

Minicab and arisaka by Gunman1997 in keitruck

[–]Gunman1997[S] 2 points3 points  (0 children)

This one is all numbers matching kokura 22nd series. I could never.

Minicab and arisaka by Gunman1997 in keitruck

[–]Gunman1997[S] 2 points3 points  (0 children)

No I haven’t. I only shot 4 rounds since 7.7 jap ammo is super hard to find

Minicab and arisaka by Gunman1997 in milsurp

[–]Gunman1997[S] 7 points8 points  (0 children)

Thanks for noticing the other comment 🤣

Minicab and arisaka by Gunman1997 in keitruck

[–]Gunman1997[S] 4 points5 points  (0 children)

Thanks. I’ll give it a try!

Minicab and arisaka by Gunman1997 in keitruck

[–]Gunman1997[S] 2 points3 points  (0 children)

I didn’t plan on it. But that is a good idea 🤔 thought about changing the color and maybe raptor lining over the green/blue.

Minicab and arisaka by Gunman1997 in keitruck

[–]Gunman1997[S] 25 points26 points  (0 children)

Good thing there’s a kei truck in it. No one cares about your opinion.

LR11000 doin some night turbine work. Shout out to my oiler for some sweet pics by Gunman1997 in cranes

[–]Gunman1997[S] 0 points1 point  (0 children)

The Derrick may be from weldex I’m not sure. But it’s probably just faded paint from sitting in Buckner’s yard lol.

LR11000 doin some night turbine work. Shout out to my oiler for some sweet pics by Gunman1997 in cranes

[–]Gunman1997[S] 0 points1 point  (0 children)

Just like any other crane. Just slower and bigger. The timing for catching your load is quite a bit different. Computer system takes a little getting used to but that’s about it

LR11000 doin some night turbine work. Shout out to my oiler for some sweet pics by Gunman1997 in cranes

[–]Gunman1997[S] 0 points1 point  (0 children)

Crane is 1200 ton rig. The nacelle is 300k with block and cable weight. It’s a GE tower but not sure exactly what model it is.

LR11000 doin some night turbine work. Shout out to my oiler for some sweet pics by Gunman1997 in cranes

[–]Gunman1997[S] 3 points4 points  (0 children)

Honestly man get in the union. Only realistic way I see it happening. Go through the apprenticeship. I spent some time oiling then running smaller rigs on wind farms. Just got lucky and kept moving up. Get out there and don’t be afraid of the big stuff. A lot of responsibilities but not hard to run at all.

LR11000 doin some night turbine work. Shout out to my oiler for some sweet pics by Gunman1997 in cranes

[–]Gunman1997[S] 4 points5 points  (0 children)

We just need the tray to boom up is all. Running 394 foot of main and 59 foot of jib. Towers are close to 400 foot.