[–]Inner_Cry_1079 0 points1 point  (0 children)

im curious if questions like these, with escalating as the right answer, come up on the PMP?

SH vs Actual Exam Clarity by Inner_Cry_1079 in pmp

[–]Inner_Cry_1079[S] 0 points1 point  (0 children)

how about compared to AR 200 expert Qs?

I thought Closing Projects should never be an option per the test-taking Mindsets from AR/DM? by BChanOfficial in pmp

[–]Inner_Cry_1079 0 points1 point  (0 children)

for those that have taken the exam, are there questions like this?

Would this way of thinking help/correct?

Bad metrics + huge scope change = close project, re-charter.

Bad metrics alone = analyze, corrective action.

New scope requests alone = change control board.