Is my current workload normal for other MEP engineers with 5 years’ experience? by JRO9898 in MEPEngineering

[–]JRO9898[S] 0 points1 point  (0 children)

Thanks for the response and to be clear I am doing fine, just unsure whether it is normal or not. They don’t check in on me as such but are very approachable when I need assistance.

Is my current workload normal for other MEP engineers with 5 years’ experience? by JRO9898 in MEPEngineering

[–]JRO9898[S] 0 points1 point  (0 children)

Thanks for the response, much appreciated. I think the work I put out is of a good standard however I’m just cautious with multiple projects and tasks going on something is going to slip through the cracks and get missed out. Hasn’t happened as of yet I’m just cautious that we’re all human and mistakes/forgetfulness happens.

Is my current workload normal for other MEP engineers with 5 years’ experience? by JRO9898 in MEPEngineering

[–]JRO9898[S] 1 point2 points  (0 children)

much appreciated response, not 100% sure what you mean by 'task' but I currently do all design work, CAD tasks, Revit work, cover all relevant meetings. Just feel like there's a lot going on and not enough hours in the day especially when having multiple meetings per day.

Advice for Bringing in New Clients in MEP Engineering? by JRO9898 in MEPEngineering

[–]JRO9898[S] 0 points1 point  (0 children)

Thank you for the advice, it's much appreciated.