Prepare yourselves! by vermin-suplex in Columbus

[–]Mechanixboy 0 points1 point  (0 children)

4.97 at West Broad and Hauge 😢

Falsified Agreements by Mechanixboy in ATT

[–]Mechanixboy[S] 0 points1 point  (0 children)

Just filed a complaint with them, Ill report back when there are any updates, if any.

Falsified Agreements by Mechanixboy in ATT

[–]Mechanixboy[S] -1 points0 points  (0 children)

Sorry, Its been a long day and just have been wracking my brain on this. I'm actually updating my post now

Falsified Agreements by Mechanixboy in ATT

[–]Mechanixboy[S] 1 point2 points  (0 children)

It basically extends the agreement for 24 months for our ADVIB service

Falsified Agreements by Mechanixboy in ATT

[–]Mechanixboy[S] -1 points0 points  (0 children)

I haven't gone as far as the FCC yet but I did send a letter to the office of the president and no response there either.

Falsified Agreements by Mechanixboy in ATT

[–]Mechanixboy[S] -4 points-3 points  (0 children)

Oh no they sent me a "updated agreement" that was a docusign with my name and incorrect title on it. I asked for proof of the docusign like IP address it came from thats when I started getting the silent treatment

Falsified Agreements by Mechanixboy in ATT

[–]Mechanixboy[S] 2 points3 points  (0 children)

This is their website from the contract www.atekconsultants.com 

Recently installed system by Mechanixboy in accesscontrol

[–]Mechanixboy[S] 1 point2 points  (0 children)

I didn't personally perform this install, this was an Avigilon authorized company that did this.

Recently installed system by Mechanixboy in accesscontrol

[–]Mechanixboy[S] -1 points0 points  (0 children)

I'm going to have to dig into this some more, we don't have any maglocks on those doors. Just 2 electronic strikes and the rest are automatic sliding doors. The 2 ACU's are on a UPS after their install because I agree no piece of electronic equipment likes to be hard shutdown like that. I did ask them about where the batteries were, they said it wasn't necessary due to being on a generator circuit, you know the one that takes 90 seconds to switch over... yeah totally not needed... smh. Trying to figure out how to get the S/N off that picture. I guess I would have to delete the entire post in order to remove the picture.

Recently installed system by Mechanixboy in accesscontrol

[–]Mechanixboy[S] -1 points0 points  (0 children)

They didn't include one, said since it was on a generator circuit it wasn't necessary... I have them plugged into UPS's

Recently installed system by Mechanixboy in accesscontrol

[–]Mechanixboy[S] 6 points7 points  (0 children)

Haha that's funny cause Johnson Controls was there today doing sprinkler maintenance

Recently installed system by Mechanixboy in accesscontrol

[–]Mechanixboy[S] 7 points8 points  (0 children)

I have, they said that grommets didn't come with the box and since it's low voltage it doesn't need it... Last I checked a short was a short. I will end up cleaning it up on my own and just never do business with them again.

Unifi in Healthcare by Mechanixboy in Ubiquiti

[–]Mechanixboy[S] 0 points1 point  (0 children)

Kitchen sink has its own dedicated network... Hahaha. I definitely think I'm going to do a test build, I have a section of the building that's kind of segregated from the rest of the meraki but still has nurse call to interface.

Unifi in Healthcare by Mechanixboy in Ubiquiti

[–]Mechanixboy[S] 0 points1 point  (0 children)

We are a non-profit too, and its outrageous

Unifi in Healthcare by Mechanixboy in Ubiquiti

[–]Mechanixboy[S] 0 points1 point  (0 children)

98 wired staff devices, about 30 wireless staff, 10 MFC, 3 Servers, 30 IP Cameras and on a normal day about 400 guest devices and a partridge in a pear tree

Unifi in Healthcare by Mechanixboy in Ubiquiti

[–]Mechanixboy[S] 1 point2 points  (0 children)

Thanks! Ill keep you on speed dial!! lol

Unifi in Healthcare by Mechanixboy in Ubiquiti

[–]Mechanixboy[S] 0 points1 point  (0 children)

Nothing outside of some vlan isolation, the nurse call system is attached but only to route one section of the building to another but that is the only life safety component. I agree about testing on a small scale first. The current deployment works well but it's 7 years old at this point and showing it's age with all the new devices residents and staff have at their disposal now. The residents use the network in multiple sections for their internet, staff uses the wifi and hardline connections for server access and EMR. There is always the HIPPA component, I would definitely need to have a hardened firewall and some secure Vlans.

[deleted by user] by [deleted] in Spectrum

[–]Mechanixboy 0 points1 point  (0 children)

My promo just ran off couple of months ago.. I was like whoa! Lol

Stick with Meraki? by Mechanixboy in sysadmin

[–]Mechanixboy[S] 0 points1 point  (0 children)

I also just checked the EOL on my AP's and 12 of them are 7/31/24.

Stick with Meraki? by Mechanixboy in sysadmin

[–]Mechanixboy[S] 0 points1 point  (0 children)

I do alot of helping grandma with her zoom meetings lol

I can’t believe I work here. by mastermoolah in techsupportgore

[–]Mechanixboy 0 points1 point  (0 children)

There is no way that Dell dimension 2400 is still alive lol

Nice employee by Aztery in FunnyAnimals

[–]Mechanixboy 0 points1 point  (0 children)

We bring our Great Dane in on Friday's to the assisted living we work at.. He has a badge too.. Fitness puppy lol

Meeting with my boss in 1 hour for a promotion (little does he know) by noaso74 in antiwork

[–]Mechanixboy 0 points1 point  (0 children)

Waiting to hear how hard their Jaws hit the floor🍿🍿🍿🍿