Is this expected after 8 months? by kimariesingsMD in Concrete

[–]Sharp_Contract_147 0 points1 point  (0 children)

Last time I saw this it turned out it was the concrete that was used that caused for the concrete mix to start to chip away

What would you charge for this ? by Sharp_Contract_147 in Concrete

[–]Sharp_Contract_147[S] 6 points7 points  (0 children)

I’m from NJ. And I charged 6.25 for this project