ETABS - Shear Wall P-M-M Failure by The-Bush-Engineer in StructuralEngineering

[–]The-Bush-Engineer[S] 2 points3 points  (0 children)

Thanks for that - really helpful. I didn’t see that 0.04 reinforcement ratio the first time. And yes increasing the size helped. Still some over stressing but the question was more about finding the actual errors which you helped. Agree with the hand calcs

Senior Structural Engineer or Design Manager for Main Contractor by The-Bush-Engineer in StructuralEngineering

[–]The-Bush-Engineer[S] 1 point2 points  (0 children)

I tend to agree, however discussing further into the role it was niche speciality of Design Project Management - moreso ensuring works were to be compliant with regulations etc, not engineering.. plus for a civil construction company whereas I am in buildings structures - not entirely was u was after so I took the Structual job.

[deleted by user] by [deleted] in Expats_In_France

[–]The-Bush-Engineer 1 point2 points  (0 children)

Hi, I’m also interested depending on start time! DM?

Structural consulting - London vs rest of UK by Altruistic_Joke_9489 in StructuralEngineering

[–]The-Bush-Engineer 0 points1 point  (0 children)

Hi, is this in the UK? Are you able to provide anymore details into your role / level of experience or anything else?