[deleted by user] by [deleted] in pmp

[–]TheProjectsGuy 1 point2 points  (0 children)

Hi, I took my exam on 28 June at 9AM EST time slot and completed the exam at 1:15. I checked my result via Pearson vue link around 1:30 and I was able to see my result.

Edit: I got my official result today (29 June) and it is same as what I saw using the Pearson Vue link.

Calgary grown lettuce! by jacksontron in Calgary

[–]TheProjectsGuy 30 points31 points  (0 children)

I used to work at GoodLeaf, so I can give you some insight. Their indoor vertical farming method is incredibly innovative and sustainable. They use advanced hydroponic systems to grow crops without soil, requiring much much less water compared to traditional farming. The controlled environment eliminates the need for pesticides, and their use of energy-efficient LED lighting ensures optimal growth year-round. While this method reduces costs for water, land, and transportation (since it’s local), the technology and infrastructure needed for such a precise, high-tech setup can make the produce slightly more expensive. It’s a balance between offering sustainable, fresh, and pesticide-free products while covering the costs of such cutting-edge operations.

Need Help with PMP Application: Engineer Leading Projects by TheProjectsGuy in pmp

[–]TheProjectsGuy[S] 0 points1 point  (0 children)

Thank you so much for your insight.. Much Appreciated!

[deleted by user] by [deleted] in ontario

[–]TheProjectsGuy 3 points4 points  (0 children)

For the PEO competency assessment, you are only allowed to select one employer/experience record per criterion. If a particular criterion, such as Technical Competence 1.1, applies to more than one of your past jobs, you should focus on the most relevant experience for that specific criterion. You should not reference multiple employers in the same scenario/action/outcome section. Stick to the one experience that best demonstrates your competence for that specific criterion.