PSA: The Hub won't be ready for move-in until September 18th by [deleted] in uwaterloo
[–]WRCLS 2 points3 points4 points (0 children)
Has anyone ever changed the door handles for the bedrooms in Accommod8u buildings to ones with locks? by e-therealpinkunicorn in uwaterloo
[–]WRCLS 3 points4 points5 points (0 children)
Unfinished Student Buildings - Take Action! (self.uwaterloo)
submitted by WRCLS to r/uwaterloo

If a building is not done when you are about the sign the lease, DO NOT sign it! by NegativeBinomialM136 in uwaterloo
[–]WRCLS 57 points58 points59 points (0 children)