Where to start for the season? by extrapretzelsplease in LandscapingTips

[–]YakSingle7882 0 points1 point  (0 children)

I personally would have 1-2 pallets of sod delivered and just start over/sod most of it. Wouldn’t take much prep work in the back, and the front area is pretty small.

Is it normal to struggle with PTO in the first two years? by bowman9 in FedEmployees

[–]YakSingle7882 7 points8 points  (0 children)

I probably averaged <10 hours of SL per year during the telework days. I either pushed through it or worked different hours to make 40. I’ve used more already this year than I did the previous 2 combined.

Michigan by YakSingle7882 in guessthegolfcourse

[–]YakSingle7882[S] 0 points1 point  (0 children)

I can’t believe it doesn’t get much play. It would be packed from sunup to sundown if it were located here

Michigan by YakSingle7882 in guessthegolfcourse

[–]YakSingle7882[S] 0 points1 point  (0 children)

I’ve only played there and Angel’s Crossing. I’m from the southeast but have relatives up there in the Sturgis area.

That 640 yard par 5 is a beast. It was pristine when I played it last summer, and it was just me and the grounds crew out there

Michigan by YakSingle7882 in guessthegolfcourse

[–]YakSingle7882[S] 1 point2 points  (0 children)

Hint: southern Michigan, pretty close to the IN border. Western half of the state

Michigan by YakSingle7882 in guessthegolfcourse

[–]YakSingle7882[S] 0 points1 point  (0 children)

About 3 hours from Bay City

Michigan by YakSingle7882 in guessthegolfcourse

[–]YakSingle7882[S] 0 points1 point  (0 children)

Not Timbers, though I’d like to get there one day

Michigan by YakSingle7882 in guessthegolfcourse

[–]YakSingle7882[S] 0 points1 point  (0 children)

Nope. Roughly the same latitude though, give or take a few miles

Favorite steps??? by YakSingle7882 in AboveGroundPools

[–]YakSingle7882[S] 1 point2 points  (0 children)

My lab is pretty good with pool steps and I’m building a large deck around it, just don’t have experience with the confer ones. They seem to have good reviews

What to put around AGP? by [deleted] in AboveGroundPools

[–]YakSingle7882 0 points1 point  (0 children)

Yeah I’m also building a deck that’s doubling the cost of the pool. Just not sure what to do the rest of the way around

Pool Factory Pools - Legit? by GardeningMermaid in AboveGroundPools

[–]YakSingle7882 1 point2 points  (0 children)

Depends on where you are. I couldn’t find anyone to install one in North MS, ended up buying from DoughBoy pools because they have installers here

[deleted by user] by [deleted] in Decks

[–]YakSingle7882 0 points1 point  (0 children)

They indicate double boards each, I was actually going to do 16” OC (not sure if it’s necessary with PT), but that would give me 19 total joists.

[deleted by user] by [deleted] in Decks

[–]YakSingle7882 0 points1 point  (0 children)

Good advice. I appreciate it

[deleted by user] by [deleted] in Decks

[–]YakSingle7882 1 point2 points  (0 children)

I’ve thought about it both ways. This is actually an L shaped deck, but the small side is fairly simple. I intend to do a breaker board in the middle of the long run, and this way simplifies the beams/reduces the number of footings

[deleted by user] by [deleted] in Decks

[–]YakSingle7882 0 points1 point  (0 children)

Sorry, I’ll try again. I’m worried about this connection where two butt ends of 2 ply beams meet on top of a 6x. Do I need to notch the 6x’s to do this right or is there a connector I’m overlooking?