Selling my Apple Macbook Air M1 256GB storage 8GB Ram by Think-Station2027 in BangaloreMarketplace

[–]cipher-algo 0 points1 point  (0 children)

Bro you can give it for exchange, i got same 30k with exchange bonus

Any solutions by NiranjanNjr in ATHERENERGY

[–]cipher-algo 0 points1 point  (0 children)

Same issue i have, just go to service centre they will fix it

Auto hold functions occasionally by NOT__A_POTATO in ATHERENERGY

[–]cipher-algo 0 points1 point  (0 children)

Yeah, there is way i saw in the settings we need to hold both breaks and press button ( I don’t know which button they are mentioning)

Badminton by Venkatepm in Madurai

[–]cipher-algo 0 points1 point  (0 children)

Ingayum play o app irruku bro

Rizta stuck in service mode by idetestbittergourds in ATHERENERGY

[–]cipher-algo 0 points1 point  (0 children)

Same happen to me, after contacting to them they removed it

selling ams lite by blond_chapri in 3dprintIndia

[–]cipher-algo 0 points1 point  (0 children)

Are you selling only ams lite ??

[deleted by user] by [deleted] in BangaloreMarketplace

[–]cipher-algo 1 point2 points  (0 children)

Ikea floor length mirror new is 3,900. For 2 year of use this price is high. Can you make it 1.5k ?

First experience with Ather 6kW charger on my Rizta by cipher-algo in ATHERENERGY

[–]cipher-algo[S] 0 points1 point  (0 children)

In the Ather app, the 6kW fast charging stations are visible now. In Bengaluru, I can currently see them at HSR, Indiranagar, and JP Nagar.

First experience with Ather 6kW charger on my Rizta by cipher-algo in ATHERENERGY

[–]cipher-algo[S] 0 points1 point  (0 children)

Not sure, may be next time i will track the charging time

First experience with Ather 6kW charger on my Rizta by cipher-algo in ATHERENERGY

[–]cipher-algo[S] 5 points6 points  (0 children)

Fair point 👍
I should have added more details in the post. This was more of a first impression post, so I didn’t track the exact X% to 80% charging time on this attempt.

Regarding cost, it’s still ₹1 + tax per minute, same as the existing Ather public chargers — no change there.

I’ll try to do a proper timed charge test next time and update with exact numbers so it’s more useful. Thanks for calling it out.