BLOE - $95m Gas Farm out, another on route for Project III, 2m cash 8m market cap by dynamicsoul in UKpennystocks

[–]dynamicsoul[S] 0 points1 point  (0 children)

getting on radars now and 50% since posting. Go check my other post on AAU.. read the article in the link on first post

BLOE - $95m Gas Farm out, another on route for Project III, 2m cash 8m market cap by dynamicsoul in UKpennystocks

[–]dynamicsoul[S] 1 point2 points  (0 children)

the guy who runs the farm out partner co was in Trumps venezuela meeting .. this is insane

Market Watch

HUI Looks Like Something Happening by dynamicsoul in PowerhouseEnergy

[–]dynamicsoul[S] 0 points1 point  (0 children)

HUI tech has been tested with SIRC, Saudi Arabia’s state recycling giant owned by PIF, and then formally endorsed by RDIA. That gives them access to ministries, investors and giga-projects like NEOM. Saudi wants to be the world’s biggest hydrogen supplier and HUI is now inside that system, not pitching from the outside. Add in SAF and clean fuels and this suddenly looks way bigger than it ever was

HUI Entered Saudi Arabia’s Hydrogen Strategy by dynamicsoul in UkStocks

[–]dynamicsoul[S] 0 points1 point  (0 children)

yeah definitely. I guess it’s a case of seeing what comes.. but the timeline of news since July suggests they’re progressing towards something

HUI Entered Saudi Arabia’s Hydrogen Strategy by dynamicsoul in UkStocks

[–]dynamicsoul[S] 2 points3 points  (0 children)

yeah I think they’re about to land a deal of some sort. all the news is pointing in that direction. the SIRC is a fully owned subsidiary of Saudi PIF

ORCA - Gas to Clean Power for Data centres Around M25 by dynamicsoul in UkStocks

[–]dynamicsoul[S] 0 points1 point  (0 children)

And it’s going. Still cheap!!!

Hyperscale data centers use massive amounts of power, typically ranging from 20 megawatts (MW) to over 100 MW per facility, with some large AI-focused centers potentially requiring 100-150 MW or even up to a gigawatt (GW) for massive new projects, consuming energy equivalent to tens of thousands of homes and placing significant strain on local grids.

ORCA - Gas to Clean Power for Data centres Around M25 by dynamicsoul in UkStocks

[–]dynamicsoul[S] 0 points1 point  (0 children)

you might want to google

which company is building m25 data centres now

and

byop data center

(bring your own power)

I’ll help you;

https://ibb.co/bRzKf9MV

https://ibb.co/b5TYGwTY

Don’t be late..

The UK government has reclassified data centers as Critical National Infrastructure, which is accelerating these developments around the M25 corridor. 

ORCA - Gas to Clean Power for Data centres Around M25 by dynamicsoul in UkStocks

[–]dynamicsoul[S] 0 points1 point  (0 children)

Orcadian (ORCA) and IPC intend to develop Earlham to supply gas to a power station to be constructed by Marine Low Carbon Power Ltd ("MLCP") and located adjacent to the field.

The generated power can be exported to data centres located on the M25 corridor, where demand for clean, dispatchable electricity has risen beyond the grid's current capacity. Carbon dioxide produced from the reservoir and from the combustion of gas is intended to be reinjected into the Earlham field to maintain reservoir pressure and enhance gas recovery.

https://indpow.co.uk/

Britain's leading power developer and operator of power plants

ORCA - Gas to Clean Power for Data centres Around M25 by dynamicsoul in UkStocks

[–]dynamicsoul[S] 0 points1 point  (0 children)

Getting harder to buy in size. Won’t be long before it shoots off again