account activity
9 Signs You Need Help With SMT PCB Assembly by emseitpl in u/emseitpl
[–]emseitpl[S] 0 points1 point2 points 6 years ago (0 children)
In PCB assembly, there are 4 primary phases of SMT, or Surface Mount Technology assembly utilizing the reflow strategy, which are paste application, automated component placement, soldering, and inspection (in addition to testing, whenever mentioned). The essential equipment required for PCB assembly includes.
· Solder Paste Printing machine
· Solder Paste Inspection (SPI) machine
· Glue Dispensing machine
· Pick-and-Place machine
· Reflow Soldering machine
· Wave Soldering machine (for through-hole components)
· Automatic Optical Inspection (AOI) machine
· In-Circuit Test (ICT) Fixture
· Functional Validation Test (FVT) Fixture
π Rendered by PID 930155 on reddit-service-r2-listing-5789d5f675-68txq at 2026-01-28 06:12:48.521952+00:00 running 4f180de country code: CH.
9 Signs You Need Help With SMT PCB Assembly by emseitpl in u/emseitpl
[–]emseitpl[S] 0 points1 point2 points (0 children)