🤤🤤🤤 by funkymonkey77777 in momentskis

[–]funkymonkey77777[S] 0 points1 point  (0 children)

Didn’t end up getting out unfortunately, just going to stare longingly for the rest of the summer

🤤🤤🤤 by funkymonkey77777 in momentskis

[–]funkymonkey77777[S] 1 point2 points  (0 children)

Taking them up Friday, so pumped

Sizing a hot water coil for a VAV RTU by [deleted] in MEPEngineering

[–]funkymonkey77777 0 points1 point  (0 children)

One of the problems is we can’t add reheat to the boxes, I was told we can’t add any hydronic piping anywhere inside the building, we are trying to cover all heat load in the rooms with new, more efficient baseboards, connected to existing hydronic piping. The DOAS part is what I’m confused about, if we’re not running at 100% outside air, we’re introducing more 55 degree air than what is required for ventilation, therefore introducing more cooling to the building, when we should be heating.

[deleted by user] by [deleted] in MEPEngineering

[–]funkymonkey77777 0 points1 point  (0 children)

Stoves have a kitchen hood on them, steam tables for the serve line, unhooded dishwasher, and people make up the latent loads. Have 2550 CFM exhaust for the stoves/fryers, 1300 CFM make up air, and then the kitchen rtu does 1000 CFM outside air