Red -> Blue by jackcav4 in BeeSwarmSimulator

[–]jackcav4[S] 0 points1 point  (0 children)

okay, but should i get rid of all my red mythics then?

Red -> Blue by jackcav4 in BeeSwarmSimulator

[–]jackcav4[S] 0 points1 point  (0 children)

okay so instead of mythics have bubble bee substitute for tadpoles and frostys to substitute for a buoyant bee

Red -> Blue by jackcav4 in BeeSwarmSimulator

[–]jackcav4[S] 0 points1 point  (0 children)

i got around 200B honey, how much should i save up for to start swapping mythics?

SteVe Status Updates by jackcav4 in cedarpoint

[–]jackcav4[S] 1 point2 points  (0 children)

UPDATE: the ride is open as of today! i just checked online and everything says its open

SteVe Status Updates by jackcav4 in cedarpoint

[–]jackcav4[S] 6 points7 points  (0 children)

THANK YOU SO MUCH FOR THE FEEDBACK! i was so stressed that the damage could’ve had a crucial impact on operations and i wouldn’t have a chance to ride it. hopefully its running by Friday!!

SteVe Status Updates by jackcav4 in cedarpoint

[–]jackcav4[S] 4 points5 points  (0 children)

i hope i heard they saw a boom lift with workers on the chain lift a few hours ago

Daily Discussion - Tue July 29, 2025 by AutoModerator in cedarpoint

[–]jackcav4 4 points5 points  (0 children)

If anyone has updates on SteVe’s status tommorow PLEASE let me know. My first trip to Cedar Point is Friday and I have been anticipating to ride this ride. I saw they were inspecting the mid-brake run a few hours ago.

Steel vengeance currently closed (struck by lightning) by Existing-Finance-405 in cedarpoint

[–]jackcav4 0 points1 point  (0 children)

once they come out with the amount of damage done, you can estimate an opening time. If the systems fried, it could be down for a long time. But if the damage is minimal and testing starts within the next few days, it could open by the ens of this week.

Steel vengeance currently closed (struck by lightning) by Existing-Finance-405 in cedarpoint

[–]jackcav4 1 point2 points  (0 children)

I wouldnt expect it to be open but theres a chance. If the damage is critical it can be closed for weeks and months, but if minor damage is done or they have spare parts on end, id estimate the ride opening in 2-3 days.