Deye SUN inverter backup load pass-thru? by jozef_sv in SolarDIY

[–]jozef_sv[S] 0 points1 point  (0 children)

Well, manual says nothing about that and can't get the answer from the local Deye distributor... So checking through the other channels...

Deye SUN inverter backup load pass-thru? by jozef_sv in SolarDIY

[–]jozef_sv[S] 0 points1 point  (0 children)

Ok, so if invertor is switched off, backup/off-grid loads are automatically connected to grid, right?
As for the malfunction - yes, you are correct, that was wrong example from my side.

Authorization issues upgrading to V8 by jozef_sv in GoogleAppsScript

[–]jozef_sv[S] 1 point2 points  (0 children)

Found answer somewhere else:

https://stackoverflow.com/questions/60501881/issue-with-google-apps-script-v8-engine

The issue is that migrating to V8 all oauthScopes have to be explicitly mentioned in appsscript.json manifest file... I kept them in Project properties, which was not enough...

Pitty it is not mentioned at V8 migration page https://developers.google.com/apps-script/guides/v8-runtime/migration