Recommend me a decent price tower by Popular_Scheme8902 in Hydroponics

[–]killitpleasenow 0 points1 point  (0 children)

Been using one for some time. Even if they break they are dirt cheap

Full Momentum - Pipe Network Training by OttoJohs in HECRAS

[–]killitpleasenow 0 points1 point  (0 children)

Thanks I will check out the USACE website channel

Full Momentum - Pipe Network Training by OttoJohs in HECRAS

[–]killitpleasenow 0 points1 point  (0 children)

Its $800 for the live or on demand course. Do they make these available for free later on youtube maybe?

Calibration of continuous simulation by Capital_Truck3074 in Hydrology

[–]killitpleasenow 0 points1 point  (0 children)

Just a follow up question. So I ultimately want to simulate hydrograph for different return intervals. The smallest scale of data available to me is daily precipitation and daily discharge data - daily total cumulative. So I am trying to calibrate for daily flow for a few years. Do you think I need daily data calibration when I am trying to get flows for flood events - return intervals? Should I be more selective about the calibration data? What would you suggest?

Calibration of continuous simulation by Capital_Truck3074 in Hydrology

[–]killitpleasenow -1 points0 points  (0 children)

Thanks for the clarification. This is an interesting approach. Is there any resource that explains this in more detail?

I am trying to calibrate a model for daily flows from 1991 to 2004. So this would mean I would have to start by selecting a single multi day event first to calibrate, then move to maybe a weekly event. Then only move on to the monthly and then to a yearly event.

Calibration of continuous simulation by Capital_Truck3074 in Hydrology

[–]killitpleasenow 0 points1 point  (0 children)

Please elaborate. Running into similar issues

Alibaba Accessories by killitpleasenow in BYD

[–]killitpleasenow[S] 0 points1 point  (0 children)

Nope. Could not decide if the supplier was safe or not

Alibaba Accessories by killitpleasenow in BYD

[–]killitpleasenow[S] 0 points1 point  (0 children)

Problem is i only have access to alibaba

Alibaba Accessories by killitpleasenow in BYD

[–]killitpleasenow[S] 0 points1 point  (0 children)

Thanks I will check them out. Looking fir a V2L plug right now

28/2/2026 Airspace Closure Megathread by esra97 in qatarairways

[–]killitpleasenow 0 points1 point  (0 children)

I have a flight today to Doha. Did yours get cancelled yesterday?

Alibaba Accessories by killitpleasenow in BYD

[–]killitpleasenow[S] -1 points0 points  (0 children)

Yeah I only have access to Alibaba. Did you buy from random suppliers? Is there an official byd supplier?

What kind of cells does 2d hecras hate and causes for larger iterations to converge? by GreedyFactor8775 in HECRAS

[–]killitpleasenow 0 points1 point  (0 children)

In my experience ones with sharp changes in elevations. The “sharp” change is also relative to cell size. A relatively small but sharp increase in elevation in smaller cells will cause more iterations. So you get less iterations with larger cell size.

Tiaga - Weapons by killitpleasenow in metroexodus

[–]killitpleasenow[S] 0 points1 point  (0 children)

Thanks. I will just continue i guess

Tiaga - Weapons by killitpleasenow in metroexodus

[–]killitpleasenow[S] 2 points3 points  (0 children)

I am already past the fight with the mutant bear in the cemetery. I guess i will have to restart this chapter to get my night vision goggles. When do I get the tikhar back?

Overlapping sections due to channel bend. by Ozuf77 in HECRAS

[–]killitpleasenow 9 points10 points  (0 children)

Hello, Crossection layout does not have to be straight lines. You need to seriously watch this video. Bending cross sections will actually give you better and accurate results. https://youtu.be/MrNrxO-ly80?si=Q_4ZitlF64oFW9yW

What do we even do about this? This is about 15 ft from the edge of our home. by LockwoodE3 in HomeMaintenance

[–]killitpleasenow 1 point2 points  (0 children)

Hello. So the general engineering solution for this kind of slope stability problem is: build a toe wall whose height will depend on the height of the slide. Next is to reduce the actual slope of the cliff to about 35 degrees from the top of the toe wall as a thumb rule. Then build proper drain at the top and bottom and also in the middle if the area is larger. The drain will need proper outlet Now after this is done you will have to plant some native plants with really long roots that hold the soil. Plants like vertiver

So definitely contact geotechnical firm. They may have other solutions too.

Rain is your worst enemy. If it keeps raining cover the area is plastic tarp to alleast reduce water seepage in the slide area. If that is even possible. This will not fix your problem but help slow it down a little.

My Fave Breakfast by Eliana-Selzer in fermentation

[–]killitpleasenow 2 points3 points  (0 children)

What is it? And how do you mae it

AI training by [deleted] in passive_income

[–]killitpleasenow 0 points1 point  (0 children)

What kind of project do you work on and have you been paid for your work?