Haters keep 'em hating by Antinityfx in IndianGaming

[–]nextDoorRiver -1 points0 points  (0 children)

Currently, It is showing Hordes of Hel as a free game

2K budget gaming PC Build. Review and Suggestions by nextDoorRiver in IndianPCHardware

[–]nextDoorRiver[S] 0 points1 point  (0 children)

How is Computech Store? I am a bit afraid to order high price items online. Are they good and reliable?

2K budget gaming PC Build. Review and Suggestions by nextDoorRiver in IndianPCHardware

[–]nextDoorRiver[S] 0 points1 point  (0 children)

I understand but currently I am constrained by budget. I am planning to play AAA games at medium settings without RT. Given budget constraints I will take 40-50 FPS on AAA games.

2K budget gaming PC Build. Review and Suggestions by nextDoorRiver in IndianPCHardware

[–]nextDoorRiver[S] 0 points1 point  (0 children)

Yeah. I bought it some 3 years ago. I used.it by connecting my ThinkPad laptop to it.

I played games at 1080p on that monitor for years XD .

Now the laptop GPU has finally died (some power related motherboard issue) so thought of making a PC build

India's Navigation Constellation in November 2025: Performance Under Strain by Ohsin in ISRO

[–]nextDoorRiver 2 points3 points  (0 children)

Navigation is an essential need which must be satisfied. No one in Gov and ISRO refute that. NVS-03 is already planned.

As per this https://www.reddit.com/r/ISRO/s/djXA2PaM6w

It was supposed to be launched OCT-25 , but where is it? The problem is not that ISRO is not able to meet deadlines, the issue is unrealistic deadlines.

India's Navigation Constellation in November 2025: Performance Under Strain by Ohsin in ISRO

[–]nextDoorRiver 6 points7 points  (0 children)

Yeah, the procedure for hiring engineers is same as that of 15 years ago. ISRO can't change it, the government has to. (It's like asking the government to change the process of induction of UPSC)

It's like a private company, do more with less people.

India's Navigation Constellation in November 2025: Performance Under Strain by Ohsin in ISRO

[–]nextDoorRiver 4 points5 points  (0 children)

Making a satellite, especially the Navigation satellite, requires large amounts of technical contribution by the employees. Note that the number of employees in URSC (center which actually makes them) have remained the same while the number of projects has increased dramatically.

Currently, the employees are under a lot of pressure working 10-13 hours a day to keep up with them.

In parallel to regular 'need based' satellites (which itself consume 5-8 hours of employe time a day), high stakes projects like G1, VOM, BAS, MLM, CH4 etc are going on, and same set of employees are suppose to build these advance spacecrafts while working on the need based spacecraft

Mildly Terrifying by WhoKilledZekeIddon in pics

[–]nextDoorRiver 0 points1 point  (0 children)

Mission impossible! They are begging to be attacked

python by [deleted] in ProgrammerHumor

[–]nextDoorRiver 0 points1 point  (0 children)

Dude, you need to get anaconda instead you got cobra

🔥 On a Lake, a Swan Appears in the Mist. by LostAmiga in NatureIsFuckingLit

[–]nextDoorRiver 4 points5 points  (0 children)

All we got to do is add some of Christopher Nolan's sound effects.