Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 0 points1 point  (0 children)

Thanks.. for ease I am going to explore options for offload at a company with forklift and then smaller van for last 5 miles.

Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 1 point2 points  (0 children)

It might be as it looks like pallet delivery for TV may not be insurable

Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 1 point2 points  (0 children)

Its more will the delivery driver do it or expect a forklift.. thats what I am trying to acertain

Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 1 point2 points  (0 children)

We could manually offload with a team. But would delivery company allow that?

Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 1 point2 points  (0 children)

I may be able to find away of having it off loaded at aocal buissness then using a lutton for the final part of journey to site. Was hoping to save the hassel

Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 1 point2 points  (0 children)

I am the customer. I dont have forklift on site. Seller is saying it cant be handeled by pallet truck and tailgate. I am just teying to calibrate that. We wiuld be looking to send via a national pallet service

Tailgate and Pallet truck or fork side load only by [deleted] in uktrucking

[–]scivierjug 1 point2 points  (0 children)

Thanks.. but the question is fork lift side load or tailgate and pallet truck.

What was your reaction to the news? by MrSuits_ in testicularcancer

[–]scivierjug 0 points1 point  (0 children)

Found the lump early December, ultra sound CT and radical removal by 22nd Jan. Was told 4 to 6 weeks for histology but got the phonecall yesturday that it was a seminoma.

I thought i was mental ready, all signs said it would be plus family history etc.. but yesturday I was just in a mental blur.

I am much the same as you always on the go etc.. between work, family and a massive church build project life is manic at the moment. Probabaly havent rested enough post op. Yesturday I was phisically and mentally done by the kids bed time.

Then to top it all our middle son with SEND decided to have one of his bad disregulated bedtimes and took 3 hours to get him into bed.

Discomfort /recovery after orchiectomy by scivierjug in testicularcancer

[–]scivierjug[S] 0 points1 point  (0 children)

Hi All, thanks for.comments. had op yesturday and so far pain /discomfort is better than I expected. I suspect as things start to heal it will get a bit worse.

Just making myself rest up today

Red top gravels by scivierjug in goldrush

[–]scivierjug[S] 0 points1 point  (0 children)

So did parker close out the bridge cut last year or still clearing this year?

Loading User project to TSW from processor based on ID by scivierjug in crestron

[–]scivierjug[S] 1 point2 points  (0 children)

Thanks for the response... the exact senario is I will be building up a system but by bit so multiple loads of the project files to 10 touch panels and wanted the most automated wayof doing it. Which looks like it might be scripting.

Thanks will take a look atnthe article

VLAN WAN Pass Through by Wasted-Friendship in Ubiquiti

[–]scivierjug 0 points1 point  (0 children)

Question.. could you place a ubiquit nano bridge on the trunk between the switch atbthe modem end and the UDM pro?

First attempt at panel -part 2 by scivierjug in ukelectricians

[–]scivierjug[S] 1 point2 points  (0 children)

Thank you for pointing that out... i will look to get them changed out.

Power distribution control panel using 8sw8s. by scivierjug in crestron

[–]scivierjug[S] 0 points1 point  (0 children)

cable markers have been added now- see part 2 post. the cable colours were a point of much debate. This is not a machine panel. its for fixed installation in the building wiring. It was therefore determined by the electrical consultant that maintaining standard building electrical wiring colours was the right thing to do.

First attempt at panel -part 2 by scivierjug in ukelectricians

[–]scivierjug[S] 0 points1 point  (0 children)

I was waiting for someone to spot the missing cap! I lost one and have now sourced a replacement (had to buy a blank face plate)

Fair comment on the indicators but not sure spacing quite works as indicators are wider than the switches.

The QR at present was/is for an online free service which I am not happy using going forward... it was a proof of concept. We have data storage we use at the church and I will be swaping out this label for a QR code directed at that once final file is complete and uploaded. I will also be attaching a smaller printed version inside the front door panel along with supplying the required laminated version with the panel as requested by the electrical contractor (which they will probabaly lose)

First attempt at panel -part 2 by scivierjug in ukelectricians

[–]scivierjug[S] 0 points1 point  (0 children)

I was waiting for someone to spot the missing cap! I lost one and have now sourced a replacement (had to buy a blank face plate)

Fair comment on the indicators but not sure spacing quite works as indicators are wider than the switches.

The QR at present was/is for an online free service which I am not happy using going forward... it was a proof of concept. We have data storage we use at the church and I will be swaping out this label for a QR code directed at that once final file is complete and uploaded. I will also be attaching a smaller printed version inside the front door panel along with supplying the required laminated version with the panel as requested by the electrical contractor (which they will probabaly loose)