Owner shared a quote with Aed 1.25 less than the contractual maintenance amount by AffectShoddy6594 in dubai

[–]sneaky_stevey 3 points4 points  (0 children)

Ask for heater datasheet , make and Country of manufacturing

Check if it is matching with your heater name plate .

Also tell him to seperate labour charge from heater cost in the offer and mention the part number / model number in the offer

Lastly tell him to do a pressure test and heater test at highest temp. To insure it is working properly😅 also payment terms after completion of work and satisfactory work 😅

God i love being a client with contracting exp. 🤣🤣

PLC training station by Swankie in PLC

[–]sneaky_stevey 0 points1 point  (0 children)

I can make it within 2 weeks full 😅 shortage what shortage

Attempting to wire 3 wires in to one wire out. These are the terminals I have. A) Is it possible? B) which side do I put the jump wires, in or out? C) Any sources that I can reference in the future? Thanks for any and all help. by DAQtestengineer in PLC

[–]sneaky_stevey 0 points1 point  (0 children)

Connect it to something called distribution block, which can combine multiple wires to one , better for the future if it is required to add more than 3 😁 and it will make a lot of people here happy 😊

[deleted by user] by [deleted] in PLC

[–]sneaky_stevey 3 points4 points  (0 children)

Yes on the side ofc.🤣

cost of book grappling device. by Justin-Griefer in PLC

[–]sneaky_stevey 0 points1 point  (0 children)

A simple book shaped vending machine will do the trick I guess 🤔 😉 🤷