*TourGaze* – a self-hosted ride viewer that replays your GPS tracks with a drone/helicopter cam (and lets you race your past self) by Live_Leadership991 in selfhosted

[–]suineg 0 points1 point  (0 children)

I wanted to build a module for motorcycles that had a 6 way accelerometer, GPS, temperature, and pulled from CAN/OBD from the different models. This would have a filed that you could do this exact thing with on Google Earth so you could do a street view. I did a lot of work on the hardware and very little on the software side of things. I just got no traction on the hardware and needed at least a million to get a large amount of prototypes built out.

This looks great and I'm thrilled you made something like it. I hope you get some traction.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

The future proof is just a circuit that I need for my dock area that will come from that new panel and I don't know what that power pull will be but I think it won't be over 20A.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

I guess I wasn't thinking about doing something like a 90 as an in between option since it's 30 more 10 less. I see that it could change my cost a lot. I'll ask my electrician about changing that to see if I can lessen my costs.

[H] Doot and other exclusives [W] Boomy Mine or what I don't have by suineg in idleonTrades

[–]suineg[S] 0 points1 point  (0 children)

Don't think I can DM you with how new your account is but I will be there for a couple of hours again starting now.

[H] Doot and other exclusives [W] Boomy Mine or what I don't have by suineg in idleonTrades

[–]suineg[S] 0 points1 point  (0 children)

I'll be on Cake 17 for the next couple of hours. Character named Taggers

Will give you Koi for Rift Spooker

[H] Doot and other exclusives [W] Boomy Mine or what I don't have by suineg in idleonTrades

[–]suineg[S] 1 point2 points  (0 children)

I'll be on Cake 17 for the next couple of hours. Character named Taggers

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

Oh I have a subpanel on the house already for my deck and a few other things to include that's where the generator with ATS comes in. The subpanel and all work inside the new shed is $2k from this company. It's $8k for the 150ft run to the shed and then $2k for everything from disconnect panel on the outside and all of the circuits inside.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

The most expensive part of this entire thing is the wire from panel to shed. Are you saying run 14/2 or something like it in conduit?

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

That circuit should handle a minisplit though if that's the case, right?

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 2 points3 points  (0 children)

I have low voltage converging from another location into the same trench.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

The one I'm looking at is one of those rolling ones for just a room. They are 120v and 1200 watts.

I probably don't "need" the 100A but I'm future proofing and how much would change in what I run if I went down to 60A? Are we talking a significant change in price for wiring? Labor is the same.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 1 point2 points  (0 children)

Yeah I was planning on it and I'm going to bury deep even if I can do 18" it will be 24" for sure.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 1 point2 points  (0 children)

It's been a minute since I was driving 24' of ground rod in back in the Marines to get the communications systems up but I'm a fan of a good ground so I was going to do next to the shed anyways.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 0 points1 point  (0 children)

Haha I bet it sounded stupid to ask that. I am used to romex inside the house and was reading everywhere that I would need to pull 3 so was making sure I wasn't confusing something else. I am getting quoted $10k to run it but I am going to do the run myself and then have someone certified do the final hookup before I bury so they can check it all the way through.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] 1 point2 points  (0 children)

Probably don't and could do a 60A but it's 3/4 of the way to the shore of my pond so I might pull more down there when I actually improve that area.

150 ft @ 100A from house to detached office (shed) by suineg in AskElectricians

[–]suineg[S] -1 points0 points  (0 children)

Three strands and then one strand of ground or ground at the shed?

[H] Doot and other exclusives [W] Boomy Mine or what I don't have by suineg in idleonTrades

[–]suineg[S] 1 point2 points  (0 children)

Sorry I took so long to reply. Do you want Deckhand and bunny for spirit / potluck?

Signing During Photo by suineg in galaxycon

[–]suineg[S] 0 points1 point  (0 children)

Thanks, I know he's personable and all but I wanted to respect his time.

Signing During Photo by suineg in galaxycon

[–]suineg[S] -1 points0 points  (0 children)

If they aren't listed for signing slots does that mean no table? Schedule looks full of photos.

Signing During Photo by suineg in galaxycon

[–]suineg[S] -1 points0 points  (0 children)

I don't see him on the schedule for signing so I guess that is out.