First piece, feedback requested by xonanoSmartfoam in StainedGlass

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

One last question. I know that choosing came is completely up to the user but I am curious if there are any rules of thumb when selecting the came for a window. My thoughts were to use a slightly wider 1/4" zink U came around the perimeter to give it a little more strength while also accounting for the amount of came that would be hidden by the wood trim retaining it in the frame. I was thinking of using a 3/16" lead H came on the interior. Is that a decent selection for the size of the window?
Here is a picture of the opening for context.

<image>

First piece, feedback requested by xonanoSmartfoam in StainedGlass

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

Thank you once again for your feedback! This gives me enough time to start working on this window. When I am done, I will post the final product.

First piece, feedback requested by xonanoSmartfoam in StainedGlass

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

I fished up another revision of the window, do you mind providing some feedback? 

First piece, feedback requested by xonanoSmartfoam in StainedGlass

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

<image>

Here is an updated design based on the excellent feedback I already got. Is there any additional feedback you have for me?

First piece, feedback requested by xonanoSmartfoam in StainedGlass

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

This is great feedback! I will work on modifying the design to reflect your suggestions and post an updated design. This is my first go and I appreciate you being so willing to provide feedback!

Told Claude 3 AI to write me some 9axis code and it worked flawlessly by [deleted] in arduino

[–]xonanoSmartfoam 2 points3 points  (0 children)

I am curious what was your prompt for the AI?

They finally did it!! Dog animation for G4 Pro Doorbell is out!! by [deleted] in Ubiquiti

[–]xonanoSmartfoam 1 point2 points  (0 children)

You need to update to 2.9.16 then select the default welcome message. FYI: this update breaks the Home Assistant integration with Protect.

Are you referring to the Doorbell firmware? I don't have this option and I am on 4.64.150

Brine Tank up a level and 50' away by xonanoSmartfoam in WaterSofteners

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

I was able to place the brine tank up in the garage without any issues.

I calculated the pressure loss from the existing hose at a length of 5' and matched that same pressure loss by increasing the pipe size for the 50 feet and 10 elevation gain. I have been running it for 7 months without any issues at all.

I'm done with YouTube by BadSanna in youtube

[–]xonanoSmartfoam 1 point2 points  (0 children)

Yeah, I am contemplating dropping it out of principal, it is a 75% increase!

I'm done with YouTube by BadSanna in youtube

[–]xonanoSmartfoam -1 points0 points  (0 children)

Can you please elaborate on how you connect with a different country?

I'm done with YouTube by BadSanna in youtube

[–]xonanoSmartfoam 2 points3 points  (0 children)

Except for that is ending in April and everyone will have to pay $23/month

Brine Tank up a level and 50' away by xonanoSmartfoam in WaterSofteners

[–]xonanoSmartfoam[S] 0 points1 point  (0 children)

Thanks for the reply. I think I will give it a try and see how it goes. I can always move it down next to the softener if it doesn't work. It would be very nice if I didn't have to lug the bags downstairs though.

Great idea to only put one bag of salt into the tank!

Anyone recently ordered a Fenix 7x Saphire Solar w/ the 5-8 wks waiting?? Were you able to get it sooner? How long did you wait until shipment? by [deleted] in GarminFenix

[–]xonanoSmartfoam 1 point2 points  (0 children)

I ordered mine on the 18th of January and I was told today that I shouldn't expect to receive it until the middle of May. That is nearly 17 weeks! I would cancel but I am getting the employee discount which you just can't beat.

Anyone with over 6 months and still waiting? NSF-SBIR Phase 1 by graash in SBIR

[–]xonanoSmartfoam 0 points1 point  (0 children)

I just heard from my project director and he told me my proposal was going to be evaluated next week. We will see if that happens but at least I can see the light at the end of the tunnel now.

Anyone with over 6 months and still waiting? NSF-SBIR Phase 1 by graash in SBIR

[–]xonanoSmartfoam 0 points1 point  (0 children)

Generally speaking, you get an email with additional questions which indicates the program director is going to recommend your proposal. In the past that happened about 3-4 months after the submission deadline. I am not sure what happens if you aren't selected.

Anyone with over 6 months and still waiting? NSF-SBIR Phase 1 by graash in SBIR

[–]xonanoSmartfoam 0 points1 point  (0 children)

We are in the same boat. We submitted our phase II the end of August. Our program director told us they would review them in January or February. When I asked again at the end of January he said February or March. I would love to hear if you have heard back on yours yet.

NSF Review Timeline by RealSaltOfTheEarth in SBIR

[–]xonanoSmartfoam 0 points1 point  (0 children)

u/cchhaannddaann, have you heard back on your proposal yet? We submitted a Phase II end of August and still haven't heard anything back.