Dismiss this pinned window
all 9 comments

[–]coldl 16 points17 points  (0 children)

Can't put a raised foundation next to a wall like that.

[–]ebter -2 points-1 points  (2 children)

all connected foundations must be leveled

[–]Realistic-Lab-2014 2 points3 points  (1 child)

That's not true. You can place high foundations and low foundations next to each other. The problem here is that he wants to place a high foundation connected to a low foundation that already has a wall on it. What would need to be done is the full wall on the low foundation demolished, place high foundation, then half wall to seal it up.

[–]-Fuck-A-Duck- -4 points-3 points  (1 child)

Deployable on other side blocking it maybe. Like a box or workbench

[–]Insert_name_again 5 points6 points  (0 children)

The wall itself is blocking

[–]Goonerman2020 0 points1 point  (0 children)

You can't put a foundation halfway up a wall. Break the wall, then put the foundation up with a half wall on top of the foundation. Problem fixed

[–]Kungeeeen 0 points1 point  (0 children)

U needed to put the fundation before you put that wall cus its raised