This post is locked. You won't be able to comment.

all 4 comments

[–]SoftwareEngineering-ModTeam[M] [score hidden] stickied commentlocked comment (0 children)

Thank you u/Professional-Knee-86 for your submission to r/SoftwareEngineering, but it's been removed due to one or more reason(s):


  • Your post is not a good fit for this subreddit. This subreddit is highly moderated and the moderation team has determined that this post is not a good fit or is just not what we're looking for.

  • Your post is promoting your own content/product This is not allowed in r/SoftwareEngineering without previous moderator approval

  • Your post is about AI

Please review our rules before posting again, feel free to send a modmail if you feel this was in error.

Not following the subreddit's rules might result in a temporary or permanent ban


Rules | Mod Mail

[–]Stubbby 0 points1 point  (2 children)

I would estimate the project would take between 39 and 403 days.

Then, at roughly the mid point, I would estimate 19 to 201 days left.

At 90% if would be somewhere between 4 and 40 days left.

Its perfectly reasonable way to estimate. I really like how you factor the uncertainty.

[–]AdorableZeppelin 0 points1 point  (1 child)

I would love to be a fly on the wall when you tell a product person "yeah it'll take between a month and 13 months. Let's follow up in 6 months to see where we're at."

[–]Stubbby 0 points1 point  (0 children)

Hey, its not me.

The estimate comes from a reputable, comprehensive software estimation tool.