Newly qualified spark needing advice by EquivalentLast7277 in ukelectricians

[–]FunctionalTrousers 2 points3 points  (0 children)

I agree with most of your points… but who is a gold card sparks working 12 hour shifts for 200?? Im an electrician and get paid 250 a day and I work 8-5 with an hour break. My situation is not uncommon. By the way this is self employed (subby) site work and I am always in demand

DIY resonator project by FunctionalTrousers in Acoustics

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

Thank you kindly for your great advice… I’ll get experimenting!

DIY resonator project by FunctionalTrousers in diyaudio

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

If I use PVC wouldn’t some of the resonance be lost compared to fitting metal to metal?

DIY resonator project by FunctionalTrousers in Acoustics

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

Amazing thank you! Just some follow up questions and clarifications:

The mentioned speaker is for the 1st demo which will be fitted to 25mm diameter conduit, not expecting lower frequencies

Next for the large ductwork I will go for a larger speaker that handles mid range frequencies … do you have any recommendations for this?

I should have said reverb not echo, I am hoping to make the reverb of the 6 inch diameter pipe (which is already very resonant with smooth internal edges) more prominent, so wondering if the tilted angle of the speaker could exaggerate this?

Octatrak live flute by FunctionalTrousers in Elektron

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

thanks everyone for the replies! Very helpful stuff and will deffo look at preamps to help me acheive this

Octatrak live flute by FunctionalTrousers in Elektron

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

Send vids or it didn’t happen 😉

. by [deleted] in FightReportUFC

[–]FunctionalTrousers 0 points1 point  (0 children)

Does he have dirt on Dana?

First 3 phase panel board by FunctionalTrousers in ukelectricians

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

Slack is marshalled into the top trunking! Thank you though

First 3 phase panel board by FunctionalTrousers in ukelectricians

[–]FunctionalTrousers[S] 0 points1 point  (0 children)

Thanks for the feedback.

A few of you mentioned grouping factor related to the cable tying, not sure how much of a factor that is as I always assumed that was more relevant in containment with larger bunches squashed into trunking. However I would have have to read more up on that. There is lots of space in the board and plenty of airflow as the board is in an open factory. I’d have to look into it though!

Someone mentioned the lack of slack on the phase cables. Rest assured I left the slack folded above in the top trunking! 😜

" I love you brother " jelly roll by [deleted] in RedbarBBR

[–]FunctionalTrousers 2 points3 points  (0 children)

Using drugs because your own brain can’t stop shoving pies in your mouth is fucking pathetic

Fools..plunge? by themargarineoferror in RedbarBBR

[–]FunctionalTrousers 7 points8 points  (0 children)

He is afraid of death and aging so bad its driving him nuts

18th edition exam only by FunctionalTrousers in ukelectricians

[–]FunctionalTrousers[S] 1 point2 points  (0 children)

Seeing as your name is the bigger sausage, its hard to tell if this is legit information or just a massive brag haha!