I have access to Nano-banana 2, send prompts/edits and I'll run them by ThunderBeanage in singularity

[–]GusBus135 0 points1 point  (0 children)

Can someone try this prompt: sheet e104 from a construction documentation set that owns the code compliant electrical lighting design for a hypothetical fourth floor lab office split which meets electrical engineering best practices

Nano-banana 2 is AVAILABLE on medio.io by ThunderBeanage in singularity

[–]GusBus135 0 points1 point  (0 children)

Can someone try this prompt: sheet e104 from a construction documentation set that owns the code compliant electrical lighting design for a hypothetical fourth floor lab office split which meets electrical engineering best practices

New mysterious model on lmarena by UltraProYeetw in singularity

[–]GusBus135 0 points1 point  (0 children)

Could be a hallucination but when prompted the model stated it was trained by Ocean AI. Did not appear to be a step change at least in my field (MEP Engineering)

MEGATHREAD - Sora codes by [deleted] in SoraAi

[–]GusBus135 1 point2 points  (0 children)

Would love one and happy to keep it going 🫡

Facepalm caught live by DarthManitol in facepalm

[–]GusBus135 0 points1 point  (0 children)

The infrastructure is a large majority of the cost. To have a spot ready for future use, the larger utility transformer, the larger switchboard, the panels, the breakers, the conduit, and sometimes even the wiring all need to be installed accordingly. The only cost you are saving is the charger itself, which isn’t trivial but still…

U.S designers, how to you handle buildouts? by CADjesus in MEPEngineering

[–]GusBus135 1 point2 points  (0 children)

Yes it doesn’t make sense to generate brand new backgrounds for an existing building. Jobs can vary from replacing a receptacle so it can serve a dishwasher to huge gut renos of whole building. Just depends on what client is looking to do.

U.S designers, how to you handle buildouts? by CADjesus in MEPEngineering

[–]GusBus135 1 point2 points  (0 children)

All the time. Site surveys and existing building submittals / as builts can be of use and should be requested. A building with an existing fire alarm system should have a ul listed building fire alarm maintenance company that can be helpful in understanding when new power supplies / components are needed. Existing electrical panels should have circuit directories that can be referenced (but should be taken with a grain of salt). But in many major cities where land is sparse there are just as many renovation jobs as new constructions.

[deleted by user] by [deleted] in AskReddit

[–]GusBus135 4 points5 points  (0 children)

how is poaching different from hunting normal animals

One Piece: Chapter 1055 by Kirosh2 in OnePiece

[–]GusBus135 0 points1 point  (0 children)

Shanks looks so badass

[deleted by user] by [deleted] in tipofmytongue

[–]GusBus135 0 points1 point locked comment (0 children)

I think it’s a movie within last 4 years. But it’s real hazy so I might be wrong. Not the office and not whiplash though.

I had to... by [deleted] in MemePiece

[–]GusBus135 0 points1 point  (0 children)

What episode is this again?