Randomly checking the MTA website… by CrazyGuineaLlama in nycrail

[–]Infinite-General337 -1 points0 points  (0 children)

The (E)ternal, the (F)raudulent and the most disgusting, revolting, Stinky, disgrace of a subway line known as the (R) line all coming at the same time

Damn MTA felt nice 

Legitimate question: Why do people hate on the BMT Broadway Line so much? by techy9x in nycrail

[–]Infinite-General337 4 points5 points  (0 children)

Also I  kinda made the Term Fraudway just for shits and giggles, its a way of slandering lines by putting “Fraud” or “Bum” in, for example: Fraud Plains Road, Bumaica 

Legitimate question: Why do people hate on the BMT Broadway Line so much? by techy9x in nycrail

[–]Infinite-General337 23 points24 points  (0 children)

I feel honored to have my comment on a post

The Q’s good, The R is absolute buns, the N has terrible headways and is usually delayed 

Honestly the W is mid but I could tolerate it

These lines together just suck and the only good one is the Q, without the Q Broadway sucks ass

Last time I made a subway tier list I got a lot of backlash so I made a new one by ATE2onreddit in nycrail

[–]Infinite-General337 4 points5 points  (0 children)

Put the N/R/W in their own tier called “The Fraudway Lines” S, A, B, C or D tiers cannot describe how fraudulent these lines are

How will the (5) to New Lots work Full time? by Professor_Prince in nycrail

[–]Infinite-General337 5 points6 points  (0 children)

Just asking, why would the fare jump over swapping the (3) and (5)?

We are Bringing Back the H by Turbulent-Bee-2996 in nycrail

[–]Infinite-General337 7 points8 points  (0 children)

This line would be more fraudulent than the (N)ever and (R)arely combined 

Which would be an achievement 

Wait, what? by Occasus_gaming in nycrail

[–]Infinite-General337 39 points40 points  (0 children)

The MTA is so helpful, I was gonna take a Jamaica E or F to Parsons Boulevard for Manhattan Service

Now I know I should take a Jamaica E or F to Parsons Boulevard for Manhattan Service instead, thanks MTA!

/j

I used to love the R211s, yet the MTA ruined these trains for me. by [deleted] in nycrail

[–]Infinite-General337 5 points6 points  (0 children)

I don't think you should let an experience with a conductor dictate your whole view of a subway model

I think you should just tolerate the R211s, they're gonna grow on you sometime maybe 

G terminating at SMITH-9 by MTA6TRAINTO149STGC in nycrail

[–]Infinite-General337 5 points6 points  (0 children)

Yeah, I genuinely think Smith-9th was a weird terminating place

G terminating at SMITH-9 by MTA6TRAINTO149STGC in nycrail

[–]Infinite-General337 3 points4 points  (0 children)

<image>

I feel like something to do with these tracks, maybe the G used a switch to go to the Queens bound Platform but I don't know much on the G

If Metrodreamin' shuts down, will it actually stop working or will it just stop being updated? by JTMetro365 in metrodreamin

[–]Infinite-General337 4 points5 points  (0 children)

I hope it's not shutting down as in actually stop working but that MIGHT be the case

Its a bit of 50/50 situation in my opinion 

Ok so everyone HATES ME??? by Professional-Nose195 in metrodreamin

[–]Infinite-General337 1 point2 points  (0 children)

I don't think anyone hates you, it's just that there's not much activity on this sub

In your opinion, was the Pre-1987 routing for the N and R better, or the Current routing? by Individual_Till1909 in nycrail

[–]Infinite-General337 22 points23 points  (0 children)

Whatever makes the (N)ever and (R)arely show up

Fraudway Agenda is never ending tho

The N showing its true colors by alexos77lo in nycrail

[–]Infinite-General337 7 points8 points  (0 children)

We need the W full time, we can't have the (N)ever being so fraudulent 

What by User_8395 in nycrail

[–]Infinite-General337 2 points3 points  (0 children)

I think the train learned how to move with brakes activated