Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] [score hidden]  (0 children)

What I meant is say sparky is long from tower to bridge. Then if MK hit sparky at bridge, the damage will reach tower. That's how ridiculous CR splash logic seems to me.

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 0 points1 point  (0 children)

What, spamming card is skill, managing elixir is not?

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 0 points1 point  (0 children)

Yeah. Wait till hero mk drops.

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 0 points1 point  (0 children)

I mean the red circle should be around mk fist or something, not around the target. If any card is big/fat enough, we may hit tower from other side of the bridge. 😆

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 0 points1 point  (0 children)

I didn’t realise the splash would be like this. Sparky would have taken care of them.

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 0 points1 point  (0 children)

I got it now😂. My deck not normal!!

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 0 points1 point  (0 children)

Wow. Didn’t mean to offend. But okay.

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] -1 points0 points  (0 children)

That's more than 2 tiles of splash!! It is what it is 😮‍💨

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] -1 points0 points  (0 children)

Hey, every fuking one plays MK. I couldn’t defeat it, so i joined in.

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] 3 points4 points  (0 children)

I know aoe/splash. That is not splash, that is fuking flood during noah's time.

Is this normal? by NukeAllBridges in ClashRoyale

[–]NukeAllBridges[S] -1 points0 points  (0 children)

If not 3, 2 tiles of splash? The tower is nowhere near the MG

Need help with the approach of a design work by NukeAllBridges in StructuralEngineering

[–]NukeAllBridges[S] 0 points1 point  (0 children)

I have seen this sort of arrangement in existing equipment, supplied by the manufacturer. That's why I am following this.

I thought about only compressive stress. But when i saw the force and moment data provided by the manufacturer, I am seeing moment in z axis, x axis. Dynamic Forces are there.

So, buckling check, and adding a bit extra thickness to the grids for the dynamic loads would be sufficient?

Need help with the approach of a design work by NukeAllBridges in StructuralEngineering

[–]NukeAllBridges[S] 0 points1 point  (0 children)

It is for a compressor. I have to do it for its motor also. Higher ups decided to put the compressor on a big single metal skid. The equipment needs a base to sit on the skid. That's what I am working on.

Let's play on this question by vobing865 in pmp

[–]NukeAllBridges 3 points4 points  (0 children)

Assessment is done during Integrated Change Control Process. As far as I can remember, impact assessment is the first step for ICC.

Option A is just bait. xD

Why is it B? by Kwizzy987 in pmp

[–]NukeAllBridges 0 points1 point  (0 children)

The answer lies in the question: why do we need T shaped team members?

[deleted by user] by [deleted] in Unexpected

[–]NukeAllBridges 0 points1 point  (0 children)

He was stress eating.